Our projects
Discover our projects
around the world
WAGABOX® units operate globally via long-term partnerships with landfills and authorities, with multiple projects aiming to make biomethane widely accessible
95%
WAGABOX® facility availability
57
WAGABOX® units worldwide
19 under construction and 38 operational
504k
tons of
of CO₂ equivalent emissions avoided since 2015
2,338
GWh of
biomethane injected since 2015
All of our projects

Aix-en-Provence (Aix-Marseille-Provence Métropole)
Under construction
France
WAGABOX® Model
1600 m3/h
Commissioning
March 2027
Installed capacity
55 GWh/year
Distance to pipeline
1,1 km
Landfill gas composition
CH4
-
N2
-

Site operator

Utility
Gas offtaker

Beaumont (OCI Global)
Under construction
United States
WAGABOX® Model
3200 m3/h
Commissioning
2026
Installed capacity
119 GWh/year
Distance to pipeline
0,09 km
Landfill gas composition
CH4
-
N2
-

Site operator
Utility
Gas offtaker

Bena (Kern County)
Under construction
United States
WAGABOX® Model
4800 m3/h
Commissioning
Q1-2027
Installed capacity
160 GWh/year
Distance to pipeline
3,54 km
Landfill gas composition
CH4
-
N2
-

Site operator
Utility
Gas offtaker

Blaringhem (Baudelet)
Operational
France
WAGABOX® Model
400 m3/h
Commissioning
September 2020
Installed capacity
25 GWh/year
Distance to pipeline
0,7 km
Landfill gas composition
CH4
39,30%
N2
26,60%

Site operator

Utility

Gas offtaker

Can Mata (PreZero)
Operational
Spain
WAGABOX® Model
2400 m3/h
Commissioning
June 2023
Installed capacity
80 GWh/year
Distance to pipeline
4 km
Landfill gas composition
CH4
47,10%
N2
18,00%

Site operator
