Our projects

Discover our projects
around the world

WAGABOX® units operate globally via long-term partnerships with landfills and authorities, with multiple projects aiming to make biomethane widely accessible

95%

WAGABOX® facility availability

57

WAGABOX® units worldwide

19 under construction and 38 operational

504k

tons of

of CO₂ equivalent emissions avoided since 2015

2,338

GWh of

biomethane injected since 2015

All of our projects

WB_Granges-720x449

Granges (Veolia)

Operational

France

WAGABOX® Model

400 m3/h

Commissioning

September 2024

Installed capacity

25 GWh/year

Distance to pipeline

4,1 km

Landfill gas composition

CH4

41,10%

N2

23,40%

under-construction

Great Oak (Randolph County)

Under construction

United States

WAGABOX® Model

4800 m3/h

Commissioning

Installed capacity

179 GWh/year

Distance to pipeline

Landfill gas composition

CH4

-

N2

-

Image-WB-Gueltas-720x540

Gueltas (Suez)

Operational

France

WAGABOX® Model

400 m3/h

Commissioning

November 2018

Installed capacity

25 GWh/year

Distance to pipeline

6 km

Landfill gas composition

CH4

47,60%

N2

13,90%

Hartland

Hartland (CRD)

Operational

Canada

WAGABOX® Model

3200 m3/h

Commissioning

May 2025

Installed capacity

100 GWh/year

Distance to pipeline

N/A

Landfill gas composition

CH4

44,50%

N2

18,00%

under-construction

Hillsborough (Hillsborough County)

Under construction

United States

WAGABOX® Model

4800 m3/h

Commissioning

Q4-2027

Installed capacity

179 GWh/year

Distance to pipeline

4,83 km

Landfill gas composition

CH4

-

N2

-

Discover our WAGABOX®

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.