Our projects

Discover our projects
around the world

WAGABOX® units operate globally via long-term partnerships with landfills and authorities, with multiple projects aiming to make biomethane widely accessible

95%

WAGABOX® facility availability

58

WAGABOX® units worldwide

20 under construction and 38 operational

504k

tons of

of CO₂ equivalent emissions avoided since 2015

2,338

GWh of

biomethane injected since 2015

All of our projects

Gournay (SEG)

Operational

France

WAGABOX® Model

400 m3/h

Commissioning

January 2022

Installed capacity

25 GWh/year

Distance to pipeline

13 km

Landfill gas composition

CH4

42,00%

N2

22,50%

under-construction

Granada (Ecocentral)

Under construction

Spain

WAGABOX® Model

2400 m3/h

Commissioning

2027

Installed capacity

80 GWh/year

Distance to pipeline

5,2 km

Landfill gas composition

CH4

-

N2

-

WB_Granges-720x449

Granges (Veolia)

Operational

France

WAGABOX® Model

400 m3/h

Commissioning

September 2024

Installed capacity

25 GWh/year

Distance to pipeline

4,1 km

Landfill gas composition

CH4

41,10%

N2

23,40%

under-construction

Great Oak (Randolph County)

Under construction

United States

WAGABOX® Model

4800 m3/h

Commissioning

Installed capacity

179 GWh/year

Distance to pipeline

Landfill gas composition

CH4

-

N2

-

Image-WB-Gueltas-720x540

Gueltas (Suez)

Operational

France

WAGABOX® Model

400 m3/h

Commissioning

November 2018

Installed capacity

25 GWh/year

Distance to pipeline

6 km

Landfill gas composition

CH4

47,60%

N2

13,90%

Discover our WAGABOX®