Our projects
Discover our projects
around the world
WAGABOX® units operate globally via long-term partnerships with landfills and authorities, with multiple projects aiming to make biomethane widely accessible
95%
WAGABOX® facility availability
57
WAGABOX® units worldwide
19 under construction and 38 operational
504k
tons of
of CO₂ equivalent emissions avoided since 2015
2,338
GWh of
biomethane injected since 2015
All of our projects

Granges (Veolia)
Operational
France
WAGABOX® Model
400 m3/h
Commissioning
September 2024
Installed capacity
25 GWh/year
Distance to pipeline
4,1 km
Landfill gas composition
CH4
41,10%
N2
23,40%

Site operator

Utility
Gas offtaker

Great Oak (Randolph County)
Under construction
United States
WAGABOX® Model
4800 m3/h
Commissioning
Installed capacity
179 GWh/year
Distance to pipeline
Landfill gas composition
CH4
-
N2
-

Site operator
Utility
Gas offtaker

Gueltas (Suez)
Operational
France
WAGABOX® Model
400 m3/h
Commissioning
November 2018
Installed capacity
25 GWh/year
Distance to pipeline
6 km
Landfill gas composition
CH4
47,60%
N2
13,90%

Site operator

Utility
Gas offtaker

Hartland (CRD)
Operational
Canada
WAGABOX® Model
3200 m3/h
Commissioning
May 2025
Installed capacity
100 GWh/year
Distance to pipeline
N/A
Landfill gas composition
CH4
44,50%
N2
18,00%

Site operator

Utility
Gas offtaker

Hillsborough (Hillsborough County)
Under construction
United States
WAGABOX® Model
4800 m3/h
Commissioning
Q4-2027
Installed capacity
179 GWh/year
Distance to pipeline
4,83 km
Landfill gas composition
CH4
-
N2
-