Our projects
Discover our projects
around the world
WAGABOX® units operate globally via long-term partnerships with landfills and authorities, with multiple projects aiming to make biomethane widely accessible
95%
WAGABOX® facility availability
57
WAGABOX® units worldwide
19 under construction and 38 operational
504k
tons of
of CO₂ equivalent emissions avoided since 2015
2,338
GWh of
biomethane injected since 2015
All of our projects

Davenport (W.C. Scott County)
Operational
United States
WAGABOX® Model
1600 m3/h
Commissioning
October 2025
Installed capacity
60 GWh/year
Distance to pipeline
2,57 km
Landfill gas composition
CH4
47,30%
N2
20,60%

Site operator
Utility
Gas offtaker

Decatur Hills (Decatur Hills)
Operational
United States
WAGABOX® Model
1600 m3/h
Commissioning
Juin 2026
Installed capacity
55 GWh/year
Distance to pipeline
4,83 km
Landfill gas composition
CH4
-
N2
-

Site operator
Utility
Gas offtaker

Éteignières (Arcavi)
Operational
France
WAGABOX® Model
400 m3/h
Commissioning
April 2024
Installed capacity
25 GWh/year
Distance to pipeline
-
Landfill gas composition
CH4
41,80%
N2
27,10%

Site operator

Utility
Gas offtaker

Fresnoy-Folny (IKOS / Paprec)
Operational
France
WAGABOX® Model
400 m3/h
Commissioning
July 2024
Installed capacity
35 GWh/year
Distance to pipeline
-
Landfill gas composition
CH4
37,90%
N2
24,40%

Site operator

Utility
Gas offtaker

Gournay (SEG)
Operational
France
WAGABOX® Model
400 m3/h
Commissioning
January 2022
Installed capacity
25 GWh/year
Distance to pipeline
13 km
Landfill gas composition
CH4
42,00%
N2
22,50%

Site operator

Utility
