Our projects

Discover our projects
around the world

WAGABOX® units operate globally via long-term partnerships with landfills and authorities, with multiple projects aiming to make biomethane widely accessible

95%

WAGABOX® facility availability

57

WAGABOX® units worldwide

19 under construction and 38 operational

504k

tons of

of CO₂ equivalent emissions avoided since 2015

2,338

GWh of

biomethane injected since 2015

All of our projects

Davenport

Davenport (W.C. Scott County)

Operational

United States

WAGABOX® Model

1600 m3/h

Commissioning

October 2025

Installed capacity

60 GWh/year

Distance to pipeline

2,57 km

Landfill gas composition

CH4

47,30%

N2

20,60%

Decatur Hills (Decatur Hills)

Operational

United States

WAGABOX® Model

1600 m3/h

Commissioning

Juin 2026

Installed capacity

55 GWh/year

Distance to pipeline

4,83 km

Landfill gas composition

CH4

-

N2

-

Éteignières (Arcavi)

Éteignières (Arcavi)

Operational

France

WAGABOX® Model

400 m3/h

Commissioning

April 2024

Installed capacity

25 GWh/year

Distance to pipeline

-

Landfill gas composition

CH4

41,80%

N2

27,10%

Fresnoy-Folny

Fresnoy-Folny (IKOS / Paprec)

Operational

France

WAGABOX® Model

400 m3/h

Commissioning

July 2024

Installed capacity

35 GWh/year

Distance to pipeline

-

Landfill gas composition

CH4

37,90%

N2

24,40%

Gournay (SEG)

Operational

France

WAGABOX® Model

400 m3/h

Commissioning

January 2022

Installed capacity

25 GWh/year

Distance to pipeline

13 km

Landfill gas composition

CH4

42,00%

N2

22,50%

Discover our WAGABOX®