Our projects around the world

Around twenty WAGABOX® units are in operation around the world, thanks to long-term partnerships with private operators of landfill sites and local authorities. 

 

Numerous projects to produce biomethane from waste are under development in Europe and North America, with the ambition, which we share with our partners, of making renewable gas accessible to as many people as possible. 

 

Visit a WAGABOX® unit

The first biomethane production plant in Spain, near Barcelona

WAGABOX® unit in Els Hostalets de Pierola (Can Mata, Spain)
Commissioning
June 2023
Installed capacity
70 GWh/year
Site operator
Network operator
All our projects
Operational
WAGABOX® unit in Chatuzange-le-Goubet
Commissioning
11 April 2024
Installed capacity
25 GWh/year
Site operator
Network operator
Type of site
150,000 tons
Landfill/year
Biogas composition

40%

CH4

Operational
WAGABOX® unit in Bath (United States)
Commissioning
15 March 2024
Installed capacity
60 GWh/year
Site operator
Network operator
Type of site
280 000 tons
Landfill/year
Biogas composition

50%

CH4

1100 PPMV

H2S

Operational
WAGABOX® unit in Sainte-Marie-Kerque (France)
Commissioning
2023
Installed capacity
21 GWh/year
Site operator
Network operator
Type of site
50 000 tons
Landfill/year
4,9 miles
Distance to network
Biogas composition

41%

CH4

50 ppm

H2S

Operational
WAGABOX® unit of Chicoutimi (Quebec)
Commissioning
December 2023
Installed capacity
16 GWh/year
Site operator
Network operator
Type of site
<1 mile
Distance to network
Biogas composition

50%

CH4

1,000-2,000 ppmv

H2S

Co-funded by
Operational
WAGABOX® unit in Cusset (Gaia)
Commissioning
October 2023
Installed capacity
17 GWh/year
Site operator
Network operator
Gas offtaker
Type of site
90,000 tonnes
Landfill/year
2.4 miles
Distance to network
Biogas composition

42%

CH4

0-3%

O2

50 ppmv

H2S

15-20%

O2

Operational
WAGABOX® unit in Els Hostalets de Pierola (Can Mata, Spain)
Commissioning
June 2023
Installed capacity
70 GWh/year
Site operator
Network operator
Type of site
70,000 tonnes
Landfill/year
3.7 miles
Distance to network
Biogas composition

42-45%

CH4

1-2%

O2

0-50 ppmv

H2S

10-22%

N2

Co-funded by
Operational
WAGABOX® unit in Saint-Étienne-des-Grès (Quebec)
Commissioning
May 2023
Installed capacity
130 GWh/year
Site operator
Network operator
Gas offtaker
Type of site
180,000 tonnes
Landfill/year
<1 miles
Distance to network
Biogas composition

45-50%

CH4

1-3%

O2

0-500 ppmv

H2S

1-25%

N2

Co-funded by
Operational
WAGABOX® unit in Montois-la-Montagne
Commissioning
January 2023
Installed capacity
20 GWh/year
Site operator
Network operator
Gas offtaker
Type of site
100,000 tonnes
Landfill/year
2.4 miles
Distance to network
Biogas composition

40-50%

CH4

0-3%

O2

0-50ppmv

H2S

1-20%

N2

Co-funded by
Operational
WAGABOX® unit in Bassilac and Auberoche (Madaillan)
Commissioning
November 2022
Installed capacity
25 GWh/year
Site operator
Network operator
Gas offtaker
Type of site
105,000 tonnes
Landfill/year
11 miles
Distance to network
Biogas composition

40-50 %

CH4

0-3 %

O2

0-50

ppmv H2S

1-20 %

N2

Co-funded by
Operational
WAGABOX® unit in Le Ham
Commissioning
April 2022
Installed capacity
20 GWh/year
Site operator
Network operator
Gas offtaker
Type of site
150,000 tonnes
Landfill/year
3.7 miles
Distance to network
Biogas composition

40-45%

CH4

3.5%

O2

0-500 ppmv

H2S

1-25%

N2

Operational
WAGABOX® unit in Claye-Souilly (La REP)
Commissioning
March 2022
Installed capacity
120 GWh/year
Site operator
Network operator
Gas offtaker
Type of site
1,100,000 tonnes
Landfill/year
13 miles
Distance to network
Biogas composition

40-50%

CH4

0.1-3%

O2

0-50

ppmv H2S

1-20%

N2

Operational
WAGABOX® unit in Gournay
Commissioning
January 2022
Installed capacity
15 GWh/year
Site operator
Network operator
Gas offtaker
Type of site
85,000 tonnes
Landfill/year
8 miles
Distance to network
Biogas composition

45-50%

CH4

0-3%

O2

600 ppmv

H2S

15-20%

N2

Operational
WAGABOX® unit in Blaringhem (Baudelet)
Commissioning
September 2020
Installed capacity
25 GWh/year
Site operator
Network operator
Gas offtaker
Type of site
200,000 tonnes
Landfill/year
0.4 miles
Distance to network
Biogas composition

40-50%

CH4

0-3%

O2

300 ppmv

H2S

5-20%

N2

Operational
WAGABOX® unit in St-Gaudens (Liéoux)
Commissioning
January 2020
Installed capacity
25 GWh/year
Site operator
Network operator
Gas offtaker
Type of site
85,000 tonnes
Landfill/year
4.3 miles
Distance to network
Biogas composition

40-45%

CH4

0-3%

O2

500 ppmv

H2S

5-20%

N2

Co-funded by