Our projects

Discover our projects
around the world

WAGABOX® units operate globally via long-term partnerships with landfills and authorities, with multiple projects aiming to make biomethane widely accessible

95%

WAGABOX® facility availability

58

WAGABOX® units worldwide

20 under construction and 38 operational

504k

tons of

of CO₂ equivalent emissions avoided since 2015

2,338

GWh of

biomethane injected since 2015

All of our projects

Septèmes-les-Vallons

Septèmes-les-Vallons (Veolia)

Operational

France

WAGABOX® Model

400 m3/h

Commissioning

June 2024

Installed capacity

25 GWh/year

Distance to pipeline

1,8 km

Landfill gas composition

CH4

41,10%

N2

20,20%

under-construction

Short Mountain (Lane County)

Under construction

United States

WAGABOX® Model

3200 m3/h

Commissioning

Q4-2027

Installed capacity

119 GWh/year

Distance to pipeline

3,54 km

Landfill gas composition

CH4

-

N2

-

under-construction

Winnebago (Air Liquide)

Operational

United States

WAGABOX® Model

400 m3/h

Commissioning

October 2023

Installed capacity

330 GWh/year

Distance to pipeline

-

Landfill gas composition

CH4

-

N2

-