Our projects

Discover our projects
around the world

WAGABOX® units operate globally via long-term partnerships with landfills and authorities, with multiple projects aiming to make biomethane widely accessible

95%

WAGABOX® facility availability

57

WAGABOX® units worldwide

19 under construction and 38 operational

504k

tons of

of CO₂ equivalent emissions avoided since 2015

2,338

GWh of

biomethane injected since 2015

All of our projects

Monflanquin (Valorizon et Avergies)

Monflanquin (Valorizon et Avergies)

Operational

France

WAGABOX® Model

400 m3/h

Commissioning

January 2026

Installed capacity

12 GWh/year

Distance to pipeline

0,3 km

Landfill gas composition

CH4

44,80%

N2

17,90%

Montois

Montois-la-Montagne (Suez)

Operational

France

WAGABOX® Model

400 m3/h

Commissioning

January 2023

Installed capacity

25 GWh/year

Distance to pipeline

4,5 km

Landfill gas composition

CH4

40,70%

N2

24,80%

Waga_Bath00027-43-720x480

New Bath (Steuben County)

Operational

United States

WAGABOX® Model

1600 m3/h

Commissioning

March 2024

Installed capacity

60 GWh/year

Distance to pipeline

4,51 km

Landfill gas composition

CH4

44,20%

N2

23,30%

under-construction

Newland Park (Wicomico County)

Under construction

United States

WAGABOX® Model

1600 m3/h

Commissioning

-

Installed capacity

62 GWh/year

Distance to pipeline

6,44 km

Landfill gas composition

CH4

-

N2

-

under-construction

Ostrom (G2)

Under construction

United States

WAGABOX® Model

3200 m3/h

Commissioning

Q1-2027

Installed capacity

185 GWh/year

Distance to pipeline

1,61 km

Landfill gas composition

CH4

-

N2

-

Discover our WAGABOX®

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.