Our projects

Discover our projects
around the world

WAGABOX® units operate globally via long-term partnerships with landfills and authorities, with multiple projects aiming to make biomethane widely accessible

95%

WAGABOX® facility availability

57

WAGABOX® units worldwide

19 under construction and 38 operational

504k

tons of

of CO₂ equivalent emissions avoided since 2015

2,338

GWh of

biomethane injected since 2015

All of our projects

under-construction

Cape May (CMCMUA)

Under construction

United States

WAGABOX® Model

1600 m3/h

Commissioning

Q1-2028

Installed capacity

60 GWh/year

Distance to pipeline

1,61 km

Landfill gas composition

CH4

-

N2

-

Chatuzange

Chatuzange-le-Goubet (Veolia)

Operational

France

WAGABOX® Model

400 m3/h

Commissioning

November 2024

Installed capacity

25 GWh/year

Distance to pipeline

5,1 km

Landfill gas composition

CH4

44,50%

N2

17,60%

Chemung

Chemung (Casella)

Operational

United States

WAGABOX® Model

4800 m3/h

Commissioning

Q3-2025

Installed capacity

179 GWh/year

Distance to pipeline

7,24 km

Landfill gas composition

CH4

44,70%

N2

19,60%

Image-WB-Chevilly-720x477

Chevilly (Suez)

Operational

France

WAGABOX® Model

400 m3/h

Commissioning

December 2018

Installed capacity

15 GWh/year

Distance to pipeline

6 km

Landfill gas composition

CH4

44,30%

N2

20,90%

chicoutimi

Chicoutimi (Matrec-GFL)

Operational

Canada

WAGABOX® Model

400 m3/h

Commissioning

December 2023

Installed capacity

25 GWh/year

Distance to pipeline

1 km

Landfill gas composition

CH4

46,90%

N2

19,60%

Discover our WAGABOX®

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.