Our projects
Discover our projects
around the world
WAGABOX® units operate globally via long-term partnerships with landfills and authorities, with multiple projects aiming to make biomethane widely accessible
95%
WAGABOX® facility availability
57
WAGABOX® units worldwide
19 under construction and 38 operational
504k
tons of
of CO₂ equivalent emissions avoided since 2015
2,338
GWh of
biomethane injected since 2015
All of our projects

Hyland (Casella)
Operational
United States
WAGABOX® Model
4800 m3/h
Commissioning
January 2026
Installed capacity
165 GWh/year
Distance to pipeline
2,82 km
Landfill gas composition
CH4
48,50%
N2
19,20%

Site operator
Utility
Gas offtaker

Inzinzac-Lochrist (Lorient-Agglomération)
Operational
France
WAGABOX® Model
400 m3/h
Commissioning
November 2019
Installed capacity
15 GWh/year
Distance to pipeline
6 km
Landfill gas composition
CH4
46,90%
N2
13,80%

Site operator

Utility

Gas offtaker

Lac-Saint-Jean (RMR)
Under construction
Canada
WAGABOX® Model
1600 m3/h
Commissioning
January 2027
Installed capacity
55 GWh/year
Distance to pipeline
1,8 km
Landfill gas composition
CH4
-
N2
-

Site operator

Utility
Gas offtaker

Lanchester (CCSWA)
Under construction
United States
WAGABOX® Model
3200 m3/h
Commissioning
Q1-2027
Installed capacity
155 GWh/year
Distance to pipeline
0,8 km
Landfill gas composition
CH4
-
N2
-

Site operator
Utility
Gas offtaker

Le Ham (Veolia)
Operational
France
WAGABOX® Model
400 m3/h
Commissioning
April 2022
Installed capacity
20 GWh/year
Distance to pipeline
6,7 km
Landfill gas composition
CH4
44,70%
N2
19,20%

Site operator

Utility
