Our projects
Discover our projects
around the world
WAGABOX® units operate globally via long-term partnerships with landfills and authorities, with multiple projects aiming to make biomethane widely accessible
95%
WAGABOX® facility availability
57
WAGABOX® units worldwide
19 under construction and 38 operational
504k
tons of
of CO₂ equivalent emissions avoided since 2015
2,338
GWh of
biomethane injected since 2015
All of our projects

Claye-Souilly (Veolia)
Operational
France
WAGABOX® Model
4000 m3/h
Commissioning
March 2022
Installed capacity
120 GWh/year
Distance to pipeline
21,8 km
Landfill gas composition
CH4
41,40%
N2
20,30%

Site operator

Utility

Gas offtaker

Clermont-Ferrand (Valtom)
Operational
France
WAGABOX® Model
400 m3/h
Commissioning
December 2024
Installed capacity
15 GWh/year
Distance to pipeline
0,7 km
Landfill gas composition
CH4
47,40%
N2
13,00%

Site operator

Utility
Gas offtaker

Cowansville (Régie de Brome-Missisquoi)
Operational
Canada
WAGABOX® Model
1000 m3/h
Commissioning
July 2024
Installed capacity
30 GWh/year
Distance to pipeline
5 km
Landfill gas composition
CH4
41,70%
N2
25,30%

Site operator

Utility
Gas offtaker

CTR Cogersa (Cogersa)
Under construction
Spain
WAGABOX® Model
1600 m3/h
Commissioning
May 2028
Installed capacity
60 GWh/year
Distance to pipeline
1 km
Landfill gas composition
CH4
-
N2
-
Site operator
Utility
Gas offtaker

Cusset (Suez/Vichy communauté)
Operational
France
WAGABOX® Model
400 m3/h
Commissioning
October 2023
Installed capacity
25 GWh/year
Distance to pipeline
4,3 km
Landfill gas composition
CH4
43,30%
N2
23,00%

Site operator

Utility
