Our projects

Discover our projects
around the world

WAGABOX® units operate globally via long-term partnerships with landfills and authorities, with multiple projects aiming to make biomethane widely accessible

95%

WAGABOX® facility availability

57

WAGABOX® units worldwide

19 under construction and 38 operational

504k

tons of

of CO₂ equivalent emissions avoided since 2015

2,338

GWh of

biomethane injected since 2015

All of our projects

1e20a971-54af-4fdc-a36b-1c192d93aad5-e1690302171362-720x391

Claye-Souilly (Veolia)

Operational

France

WAGABOX® Model

4000 m3/h

Commissioning

March 2022

Installed capacity

120 GWh/year

Distance to pipeline

21,8 km

Landfill gas composition

CH4

41,40%

N2

20,30%

VALTOM-12_BD-720x480

Clermont-Ferrand (Valtom)

Operational

France

WAGABOX® Model

400 m3/h

Commissioning

December 2024

Installed capacity

15 GWh/year

Distance to pipeline

0,7 km

Landfill gas composition

CH4

47,40%

N2

13,00%

Cowansville

Cowansville (Régie de Brome-Missisquoi)

Operational

Canada

WAGABOX® Model

1000 m3/h

Commissioning

July 2024

Installed capacity

30 GWh/year

Distance to pipeline

5 km

Landfill gas composition

CH4

41,70%

N2

25,30%

under-construction

CTR Cogersa (Cogersa)

Under construction

Spain

WAGABOX® Model

1600 m3/h

Commissioning

May 2028

Installed capacity

60 GWh/year

Distance to pipeline

1 km

Landfill gas composition

CH4

-

N2

-

cusset

Cusset (Suez/Vichy communauté)

Operational

France

WAGABOX® Model

400 m3/h

Commissioning

October 2023

Installed capacity

25 GWh/year

Distance to pipeline

4,3 km

Landfill gas composition

CH4

43,30%

N2

23,00%

Discover our WAGABOX®

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.