Our projects
Discover our projects
around the world
WAGABOX® units operate globally via long-term partnerships with landfills and authorities, with multiple projects aiming to make biomethane widely accessible
95%
WAGABOX® facility availability
57
WAGABOX® units worldwide
19 under construction and 38 operational
504k
tons of
of CO₂ equivalent emissions avoided since 2015
2,338
GWh of
biomethane injected since 2015
All of our projects

Saint-Palais (Veolia)
Operational
France
WAGABOX® Model
400 m3/h
Commissioning
November 2018
Installed capacity
20 GWh/year
Distance to pipeline
1,6 km
Landfill gas composition
CH4
44,50%
N2
17,80%

Site operator

Utility

Gas offtaker

Sainte-Marie-Kerque (OPALE / Séché)
Operational
France
WAGABOX® Model
400 m3/h
Commissioning
December 2024
Installed capacity
35 GWh/year
Distance to pipeline
-
Landfill gas composition
CH4
38,40%
N2
27,70%

Site operator

Utility
Gas offtaker

SECCRA (SECCRA)
Under construction
United States
WAGABOX® Model
2000 m3/h
Commissioning
2026
Installed capacity
67 GWh/year
Distance to pipeline
1,61 km
Landfill gas composition
CH4
-
N2
-

Site operator
Utility
Gas offtaker

Septèmes-les-Vallons (Veolia)
Operational
France
WAGABOX® Model
400 m3/h
Commissioning
June 2024
Installed capacity
25 GWh/year
Distance to pipeline
1,8 km
Landfill gas composition
CH4
41,10%
N2
20,20%

Site operator

Utility
Gas offtaker

Short Mountain (Lane County)
Under construction
United States
WAGABOX® Model
3200 m3/h
Commissioning
Q4-2027
Installed capacity
119 GWh/year
Distance to pipeline
3,54 km
Landfill gas composition
CH4
-
N2
-