Fifteen WAGABOX® units in operation in France
Waga Energy operates fifteen WAGABOX® units in France and has contracts with major waste management companies (Suez, Veolia, and Paprec), as well as with local authorities. Fifteen more units are under construction, in France, Spain, Canada and the United States.
Saint-Florentin
Capacity: 85,300 mmBtu/year
Landfill operator: Coved Environnement
Commissioning: February 14, 2017
Distance of the gas grid: 1.8 miles
Saint-Maximin
Capacity: 85,300 mmBtu/year
Landfill operator: Suez
Commissioning: June 26, 2017
Distance of the gas grid: 0.7 miles
Pavie
Capacity: 51,180 mmBtu/year
Landfill operator: Trigone
Commissioning: May 30, 2018
Distance of the gas grid: 1.8 miles
Saint-Palais
Capacity: 68,200 mmBtu/year
Landfill operator: Veolia
Commissioning: November 6, 2018
Distance of the gas grid: 0.6 miles
Gueltas
Capacity: 85,300 mmBtu/year
Landfill operator: Suez
Commissioning: November 13, 2018
Distance of the gas grid: 3.7 miles
Chevilly
Capacity: 51,180 mmBtu/year
Landfill operator: Suez
Commissioning: December 20, 2018
Distance of the gas grid: 3.7 miles
Izinzac-Lochrist
Capacity: 51,180 mmBtu/year
Landfill operator: Lorient Agglomération
Commissioning: November 26, 2019
Distance of the gas grid: 3.7 miles
Les-Ventes-de-Bourse
Capacity: 85,300 mmBtu/year
Landfill operator: Suez
Commissioning: January 15, 2020
Distance of the gas grid: 8.6 miles
Liéoux
Capacity: 119,400 mmBtu/year
Landfill operator: Sivom SGMAM
Commissioning: January 16, 2020
Distance of the gas grid: 4.3 miles
Le Ham
Capacity: 68,200 mmBtu/year
Landfill operator: Veolia
Commissioning: April 11, 2022
Distance of the gas grid: 6.7 miles
Blaringhem
Capacity: 85,300 mmBtu/year
Landfill operator: Baudelet Environnement
Commissioning: September 2, 2020
Distance of the gas grid: 0.7 miles
Gournay
Capacity: 51,180 mmBtu/year
Landfill operator: SEG
Commissioning: January 26, 2022
Distance of the gas grid: 13 miles
Claye-Souilly
Capacity: 409,000 mmBtu/year
Landfill operator: Veolia
Commissioning: March 9, 2022
Distance of the gas grid: 21.8 miles
Chatuzange-le-Goubet
Capacity: 61,410 mmBtu/year
Landfill operator: Veolia
Commissioning: 2024
Milhac-d'Auberoche
Capacity: 68,240 mmBtu/year
Landfill operator: Suez
Commissioning: Novemnber 11,2022
Distance of the gas grid: 18 miles
Montois-la-Montagne
Capacity: 51,180 mmBtu/year
Landfill operator: Suez
Commissioning: January 26, 2023
Distance of the gas grid: 4,5 km
Cusset
Capacity: 51,180 mmBtu/year
Landfill operator: Suez / Vichy Communauté
Commissioning: 2023
Sainte-Marie-Kerque
Capacity: 71,650 mmBtu/year
Landfill operator: Séché Environnement
Commissioning: 2023
Granges
Capacity: 85,300 mmBtu/year
Landfill operator: Veolia
Commissioning: 2024
Can Mata
Capacity: 238,850 mmBtu/year
Landfill operator: PreZero
Commissioning: 2023
Saint-Etienne-des-Grès
Capacity: 444,000 mmBtu/year
Landfill operator: Régie de la Mauricie
Commissioning: 2023
Cowansville
Capacity: 102,000 mmBtu/year
Landfill operator: Régie de Brome-Missisquoi
Commissioning: 2023
Hartland
Capacity: 345,000 mmBtu/year
Landfill operator: CRD
Commissioning: 2024
Bath
Capacity: 205,000 mmBtu/year
Landfill operator: Steuben County
Commissioning: 2023
Mallard Ridge
Commissioning: March 28, 2022
Landfill operator: Air Liquide
Winnebago
Landfill operator: Air Liquide
Commissioning: Early 2023
Construction of the first WAGABOX®
unit in Spain with the support of the European Union
WAGABOX® unit of Saint-Florentin
Saint-Florentin landfill (France)
Commissioning: February 14, 2017
- 70,000 tons of waste per year
- Biogas: 40-50 % CH4 | 0-3 % O2 | 1,500 ppmv H2S | 5-25 % N2
- Distance of the gas grid: 3 kilometers
- Existing gas recovery solution: leachate evaporation
- Capacity: 25 GWh/year (85,300 mmBtu)

WAGABOX® unit of Saint-Maximin
Saint-Maximin landfill (France)
Commissioning: June 26, 2017
- 200,000 tons of waste per year
- Biogas: 45-50% CH4 | 0-3% O2 | 7,000 ppmv H2S | 5-20 % N2
- Distance of the gas grid: 1.2 kilometer
- Existing gas recovery solution: leachate evaporation
- Capacity: 25 GWh/an (85,300 mmBtu)

WAGABOX® unit of Pavie
Pavie landfill (France)
Commissioning: May 30, 2018
- 40,000 tons of waste per year
- Biogas: 40-50% CH4 | 0-3% O2 | 500 ppmv H2S | 5-25 % N2
- Distance of the gas grid: 3 kilometers
- Existing gas recovery solution: leachate evaporation
- Capacity: 15 GWh/year (51,180 mmBtu)

WAGABOX® unit of Saint-Palais
Saint-Palais lanfill (France)
Commissioning: November 6, 2018
- 90,000 tons of waste per year
- Biogas :40-50% CH4 | 0-3% O2 | 1,000 ppmv H2S | 5-20 % N2
- Distance of the gas grid: 1.6 kilometer
- Existing gas recovery solution: Combine Heat and Power
- Capacity: 20 GWh/year (68,200 mmBtu)

WAGABOX® unit of Gueltas
Gueltas landfill (France)
Commissioning: November 13, 2018
- 200,000 tons of waste per year
- Biogas :45-50 % CH4 | 0-5 % O2 | 1,000 ppmv H2S | 5-20 % N2
- Distance of the gas grid: 6 kilometers
- Existing gas recovery solution: Combine Heat and Power
- Capacity: 25 GWh/year (85,300 mmBtu)

WAGABOX® unit of Chevilly
Chevilly landfill (France)
Commissioning: December 20, 2018
- 60,000 tons of waste per year
- Biogas :40-50% CH4 | 0-3% O2 | 4,000 ppmv H2S | 5-20 % N2
- Distance of the gas grid: 6 kilometers
- Existing gas recovery solution: leachate evaporation
- Capacity: 15 GWh/year (51,180 mmBtu)

WAGABOX® unit of Izinzac-Lochrist
Izinzac-Lochrist landfill (France)
Commissioning: November 26, 2019
- 60,000 tons of waste per year
- Biogas: 45-50% CH4 | 0-3% O2 | 4,000 ppmv H2S | 5-20 % N2
- Distance of the gas grid: 6 kilometers
- Existing gas recovery solution: leachate evaporation
- Capacity: 15 GWh/year (51,180 mmBtu)

WAGABOX® unit of Les Ventes-de-Bourse
Les Ventes-de-Bourse landfill (France)
Commissioning: January 15, 2020
- 120,000 tons of waste per year
- Biogas: 45-50% CH4 | 0-3% O2 | 4,000 ppmv H2S | 5-20 % N2
- Distance of the gas grid: 14 kilometers
- Existing gas recovery solution: leachate evaporation
- Capacity: 25 GWh/year (85,300 mmBtu)

WAGABOX® unit of Liéoux
Liéoux landfill (France)
Commissioning: January 16, 2020
- 85,000 tons of waste per year
- Biogas: 45-50% CH4 | 0-3% O2 | 4,000 ppmv H2S | 5-20 % N2
- Distance of the gas grid: 7 kilometers
- Existing gas recovery solution: leachate evaporation
- Capacity: 35 GWh/year (119,400 mmBtu)

WAGABOX® unit of Blaringhem
Blaringhem landfill (France)
Commissioning: September 2, 2020
- 600,000 tons of waste per year
- Biogas: 40-50% CH4 | 0-3% O2 | 300 ppmv H2S | 5-20 % N2
- Distance of the gas grid: 0.7 kilometers
- Existing gas recovery solution: four engines
- Capacity: 25 GWh/year (85,300 mmBtu)

WAGABOX® unit of Gournay
Gournay landfill (France)
Commissioning: January 26, 2022
- 85,000 tons of waste per year
- Biogas: 45-50% CH4 | 0-3% O2 | 600 ppmv H2S | 15-20 % N2
- Distance of the gas grid: 13 kilometers
- Existing gas recovery solution: leachate evaporation
- Capacity: 15 GWh/year (51,180 mmBtu)

WAGABOX® unit of Claye-Souilly
Claye-Souilly landfill (France)
Commissioning: March 9, 2022
- 1,100,000 tons of waste per year
- Biogas: 40-50% CH4 | 0.1-3% O2 | 0-50 ppmv H2S | 1-20 % N2
- Distance of the gas grid: 21.8 kilometers
- Existing gas recovery solution: Combine Heat and Power
- Capacity: 120 GWh/year (409,000 mmBtu)

WAGABOX® unit of Le Ham
Le Ham landfill (France)
Commissioning: April 11, 2022
- 150,000 tons of waste per year
- Biogas: 40-45% CH4 | 0-3,5 O2 | 0-500 ppmv H2S | 1-25 % N2
- Distance of the gas grid: 6,7 kilometers
- Existing gas recovery solution: Combine Heat and Power (2 engines)
- Capacity: 20 GWh/year (68,200 mmBtu)

WAGABOX® unit of Milhac-d’Auberoche
Milhac-d’Auberoche landfill (France)
Commissioning: November 11, 2022
- 105,000 tons of waste per year
- Biogas: 40-50% CH4 | 0-3 O2 | 0-50 ppmv H2S | 1-20 % N2
- Distance of the gas grid: 18 kilometers
- Capacity: 25 GWh/year (85,300 mmBtu/year)

WAGABOX® unit of Montois-la-Montagne
Montois-la-Montagne landfill (France)
Commissioning: January 26, 2023
- 100,000 tons of waste per year
- Distance of the gas grid: 4,5 kilometers
- Capacity: 20 GWh/year (51,180 mmBtu/year)