Our projects
Discover our projects
around the world
WAGABOX® units are deployed worldwide through long-term partnerships with landfills and local authorities. New renewable natural gas projects from waste are under development across Europe and North America, helping make renewable gas accessible to more people
95%
WAGABOX® facility availability
57
WAGABOX® units worldwide
19 under construction and 38 operational
504k
tons of
of CO₂ equivalent emissions avoided since 2015
7.98 M
MMBtu of
RNG injected since 2015
All of our projects

Ostrom Road Landfill (Wheatland, CA)
Under construction
United States
WAGABOX® Model
2000 scfm
Commissioning
Q1-2027
Installed capacity
419,693 MMBtu/year
Distance to pipeline
1 mile
Landfill gas composition
CH4
-
N2
-

Site operator
Utility
Gas offtaker

Pavie (Trigone)
Operational
France
WAGABOX® Model
250 scfm
Commissioning
May 2018
Installed capacity
51,182 MMBtu/year
Distance to pipeline
1.9 miles
Landfill gas composition
CH4
47,50%
N2
14,20%

Site operator
Utility

Gas offtaker

Podere Rota (CSAI)
Under construction
Italy
WAGABOX® Model
500 scfm
Commissioning
September 2026
Installed capacity
98,952 MMBtu/year
Distance to pipeline
0.4 miles
Landfill gas composition
CH4
-
N2
-

Site operator
Utility
Gas offtaker

Polo Industriale Scapigliato (Scapigliato)
Under construction
Italy
WAGABOX® Model
1500 scfm
Commissioning
December 2026
Installed capacity
313,917 MMBtu/year
Distance to pipeline
1.4 miles
Landfill gas composition
CH4
-
N2
-

Site operator
Utility
Gas offtaker

Rockingham County Landfill (Madison, NC)
Under construction
United States
WAGABOX® Model
1000 scfm
Commissioning
October 2025
Installed capacity
204,729 MMBtu/year
Distance to pipeline
2 miles
Landfill gas composition
CH4
-
N2
-