Our projects

Discover our projects
around the world

WAGABOX® units are deployed worldwide through long-term partnerships with landfills and local authorities. New renewable natural gas projects from waste are under development across Europe and North America, helping make renewable gas accessible to more people

95%

WAGABOX® facility availability

57

WAGABOX® units worldwide

19 under construction and 38 operational

504k

tons of

of CO₂ equivalent emissions avoided since 2015

7.98 M

MMBtu of

RNG injected since 2015

All of our projects

under-construction

CMCMUA Secure Sanitary Landfill (Woodbine, NJ)

Under construction

United States

WAGABOX® Model

1000 scfm

Commissioning

Q1-2028

Installed capacity

204,729 MMBtu/year

Distance to pipeline

1 mile

Landfill gas composition

CH4

-

N2

-

Chatuzange

Chatuzange-le-Goubet (Veolia)

Operational

France

WAGABOX® Model

375 scfm

Commissioning

November 2024

Installed capacity

85,304 MMBtu/year

Distance to pipeline

3.2 miles

Landfill gas composition

CH4

44,50%

N2

17,60%

Chemung

Chemung Landfill (Elmira, NY)

Operational

United States

WAGABOX® Model

3000 scfm

Commissioning

Q3-2025

Installed capacity

610,773 MMBtu/year

Distance to pipeline

4.5 miles

Landfill gas composition

CH4

44,70%

N2

19,60%

Image-WB-Chevilly-720x477

Chevilly (Suez)

Operational

France

WAGABOX® Model

250 scfm

Commissioning

December 2018

Installed capacity

51,182 MMBtu/year

Distance to pipeline

3.7 miles

Landfill gas composition

CH4

44,30%

N2

20,90%

20191213_160706-720x540

Inzinzac-Lochrist (Lorient Agg)

Operational

France

WAGABOX® Model

250 scfm

Commissioning

November 2019

Installed capacity

51,182 MMBtu/year

Distance to pipeline

3.7 miles

Landfill gas composition

CH4

46,90%

N2

13,80%

Discover our WAGABOX® technology