Our projects
Discover our projects
around the world
WAGABOX® units are deployed worldwide through long-term partnerships with landfills and local authorities. New renewable natural gas projects from waste are under development across Europe and North America, helping make renewable gas accessible to more people
95%
Industrial units availability
58
WAGABOX® units worldwide
20 under construction and 38 operational
504k
tons of
of CO₂ equivalent emissions avoided since 2015
7.98 M
MMBtu of
RNG injected since 2015
All of our projects

Lac-Saint-Jean (RMR)
Under construction
Canada
WAGABOX® Model
1000 scfm
Commissioning
January 2027
Installed capacity
187,668 MMBtu/year
Distance to pipeline
1.1 miles
Landfill gas composition
CH4
-
N2
-

Site operator

Utility

Gas offtaker

LLARC Landfill (Narvon, PA)
Under construction
United States
WAGABOX® Model
2000 scfm
Commissioning
Q1-2027
Installed capacity
528,882 MMBtu/year
Distance to pipeline
0.5 miles
Landfill gas composition
CH4
-
N2
-

Site operator
Utility
Gas offtaker

Le Ham (Veolia)
Operational
France
WAGABOX® Model
375 scfm
Commissioning
April 2022
Installed capacity
68,243 MMBtu/year
Distance to pipeline
4.2 miles
Landfill gas composition
CH4
44,70%
N2
19,20%

Site operator

Utility

Gas offtaker

Les Ventes-de-Bourse (Suez)
Operational
France
WAGABOX® Model
375 scfm
Commissioning
January 2020
Installed capacity
85,304 MMBtu/year
Distance to pipeline
8.7 miles
Landfill gas composition
CH4
40,80%
N2
20,60%

Site operator

Utility

Gas offtaker

Mallard Ridge landfill (Delavan, WI)
Operational
United States
WAGABOX® Model
250 scfm
Commissioning
March 2022
Installed capacity
375,336 MMBtu/year
Distance to pipeline
-
Landfill gas composition
CH4
-
N2
-