Our projects
Discover our projects
around the world
WAGABOX® units are deployed worldwide through long-term partnerships with landfills and local authorities. New renewable natural gas projects from waste are under development across Europe and North America, helping make renewable gas accessible to more people
95%
WAGABOX® facility availability
57
WAGABOX® units worldwide
19 under construction and 38 operational
504k
tons of
of CO₂ equivalent emissions avoided since 2015
7.98 M
MMBtu of
RNG injected since 2015
All of our projects

Le Ham (Veolia)
Operational
France
WAGABOX® Model
375 scfm
Commissioning
April 2022
Installed capacity
68,243 MMBtu/year
Distance to pipeline
4.2 miles
Landfill gas composition
CH4
44,70%
N2
19,20%

Site operator
Utility

Gas offtaker

Les Ventes-de-Bourse (Suez)
Operational
France
WAGABOX® Model
375 scfm
Commissioning
January 2020
Installed capacity
85,304 MMBtu/year
Distance to pipeline
8.7 miles
Landfill gas composition
CH4
40,80%
N2
20,60%

Site operator
Utility
Gas offtaker
Mallard Ridge landfill (Delavan, WI)
Operational
United States
WAGABOX® Model
250 scfm
Commissioning
March 2022
Installed capacity
375,336 MMBtu/year
Distance to pipeline
-
Landfill gas composition
CH4
-
N2
-
Site operator
Utility
Gas offtaker

McKean Landfill (East Kane, PA)
Operational
United States
WAGABOX® Model
2000 scfm
Commissioning
June 2026
Installed capacity
375,336 MMBtu/year
Distance to pipeline
1.2 miles
Landfill gas composition
CH4
-
N2
-

Site operator
Utility
Gas offtaker

Milhac-d’Auberoche (Suez)
Operational
France
WAGABOX® Model
375 scfm
Commissioning
November 2022
Installed capacity
85,304 MMBtu/year
Distance to pipeline
11.2 miles
Landfill gas composition
CH4
42,00%
N2
25,90%