Our projects

Discover our projects
around the world

WAGABOX® units are deployed worldwide through long-term partnerships with landfills and local authorities. New renewable natural gas projects from waste are under development across Europe and North America, helping make renewable gas accessible to more people

95%

Industrial units availability

58

WAGABOX® units worldwide

20 under construction and 38 operational

504k

tons of

of CO₂ equivalent emissions avoided since 2015

7.98 M

MMBtu of

RNG injected since 2015

All of our projects

under-construction

Lac-Saint-Jean (RMR)

Under construction

Canada

WAGABOX® Model

1000 scfm

Commissioning

January 2027

Installed capacity

187,668 MMBtu/year

Distance to pipeline

1.1 miles

Landfill gas composition

CH4

-

N2

-

under-construction

LLARC Landfill (Narvon, PA)

Under construction

United States

WAGABOX® Model

2000 scfm

Commissioning

Q1-2027

Installed capacity

528,882 MMBtu/year

Distance to pipeline

0.5 miles

Landfill gas composition

CH4

-

N2

-

Image-WB-Milhac-LeHam-720x540

Le Ham (Veolia)

Operational

France

WAGABOX® Model

375 scfm

Commissioning

April 2022

Installed capacity

68,243 MMBtu/year

Distance to pipeline

4.2 miles

Landfill gas composition

CH4

44,70%

N2

19,20%

Image-WB-Ventes-de-Bourse-e1691743810356-720x615

Les Ventes-de-Bourse (Suez)

Operational

France

WAGABOX® Model

375 scfm

Commissioning

January 2020

Installed capacity

85,304 MMBtu/year

Distance to pipeline

8.7 miles

Landfill gas composition

CH4

40,80%

N2

20,60%

mallard

Mallard Ridge landfill (Delavan, WI)

Operational

United States

WAGABOX® Model

250 scfm

Commissioning

March 2022

Installed capacity

375,336 MMBtu/year

Distance to pipeline

-

Landfill gas composition

CH4

-

N2

-

Discover our WAGABOX® technology