Our projects
Discover our projects
around the world
WAGABOX® units are deployed worldwide through long-term partnerships with landfills and local authorities. New renewable natural gas projects from waste are under development across Europe and North America, helping make renewable gas accessible to more people
95%
WAGABOX® facility availability
57
WAGABOX® units worldwide
19 under construction and 38 operational
504k
tons of
of CO₂ equivalent emissions avoided since 2015
7.98 M
MMBtu of
RNG injected since 2015
All of our projects

Saint-Palais (Veolia)
Operational
France
WAGABOX® Model
375 scfm
Commissioning
November 2018
Installed capacity
68,243 MMBtu/year
Distance to pipeline
1 mile
Landfill gas composition
CH4
44,50%
N2
17,80%

Site operator
Utility

Gas offtaker

Sainte-Marie-Kerque (OPALE / Séché)
Operational
France
WAGABOX® Model
500 scfm
Commissioning
December 2024
Installed capacity
119,425 MMBtu/year
Distance to pipeline
-
Landfill gas composition
CH4
38,40%
N2
27,70%

Site operator
Utility
Gas offtaker

SECCRA Community Landfill (West Grove, PA)
Under construction
United States
WAGABOX® Model
250 scfm
Commissioning
2026
Installed capacity
228,614 MMBtu/ year
Distance to pipeline
1 mile
Landfill gas composition
CH4
-
N2
-

Site operator
Utility
Gas offtaker

Septèmes-les-Vallons (Veolia)
Operational
France
WAGABOX® Model
375 scfm
Commissioning
June 2024
Installed capacity
85,304 MMBtu/year
Distance to pipeline
1.1 miles
Landfill gas composition
CH4
41,10%
N2
20,20%

Site operator
Utility
Gas offtaker

Short Mountain Landfill (Eugene, OR)
Under construction
United States
WAGABOX® Model
2000 scfm
Commissioning
Q4-2027
Installed capacity
406,045 MMBtu/year
Distance to pipeline
2.2 miles
Landfill gas composition
CH4
-
N2
-