Our projects
Discover our projects
around the world
WAGABOX® units are deployed worldwide through long-term partnerships with landfills and local authorities. New renewable natural gas projects from waste are under development across Europe and North America, helping make renewable gas accessible to more people
95%
Industrial units availability
58
WAGABOX® units worldwide
20 under construction and 38 operational
504k
tons of
of CO₂ equivalent emissions avoided since 2015
7.98 M
MMBtu of
RNG injected since 2015
All of our projects

Gueltas (Suez)
Operational
France
WAGABOX® Model
375 scfm
Commissioning
November 2018
Installed capacity
85,304 MMBtu/year
Distance to pipeline
3.7 miles
Landfill gas composition
CH4
47,60%
N2
13,90%

Site operator

Utility

Gas offtaker

Hartland (CRD)
Operational
Canada
WAGABOX® Model
2000 scfm
Commissioning
May 2025
Installed capacity
341,214 MMBtu/year
Distance to pipeline
-
Landfill gas composition
CH4
44,50%
N2
18,00%

Site operator

Utility
Gas offtaker

Hay Road Landfill (Vacaville, CA)
Under construction
United States
WAGABOX® Model
2000 scfm
Commissioning
2026
Installed capacity
631,249 MMBtu/year
Distance to pipeline
1 mile
Landfill gas composition
CH4
-
N2
-

Site operator
Utility
Gas offtaker

Southeast County Landfill (Lithia, FL)
Under construction
United States
WAGABOX® Model
3000 scfm
Commissioning
Q4-2027
Installed capacity
610,773 MMBtu/year
Distance to pipeline
3 miles
Landfill gas composition
CH4
-
N2
-

Site operator
Utility
Gas offtaker

Hyland Landfill (Angelica, NY)
Operational
United States
WAGABOX® Model
1500 scfm
Commissioning
January 2026
Installed capacity
563,003 MMBtu/year
Distance to pipeline
1.8 miles
Landfill gas composition
CH4
48.50%
N2
19.20%