Our projects

Discover our projects
around the world

WAGABOX® units are deployed worldwide through long-term partnerships with landfills and local authorities. New renewable natural gas projects from waste are under development across Europe and North America, helping make renewable gas accessible to more people

95%

WAGABOX® facility availability

57

WAGABOX® units worldwide

19 under construction and 38 operational

504k

tons of

of CO₂ equivalent emissions avoided since 2015

7.98 M

MMBtu of

RNG injected since 2015

All of our projects

Gournay (SEG)

Operational

France

WAGABOX® Model

375 scfm

Commissioning

January 2022

Installed capacity

85,304 MMBtu/year

Distance to pipeline

8 miles

Landfill gas composition

CH4

42,00%

N2

22,50%

WB_Granges-720x449

Granges (Veolia)

Operational

France

WAGABOX® Model

250 scfm

Commissioning

September 2024

Installed capacity

85,304 MMBtu/year

Distance to pipeline

2.5 miles

Landfill gas composition

CH4

41,10%

N2

23,40%

under-construction

Great Oak Landfill (Randleman, NC)

Under construction

United States

WAGABOX® Model

3000 scfm

Commissioning

Installed capacity

610,000 MMBtu/year

Distance to pipeline

Landfill gas composition

CH4

-

N2

-

Image-WB-Gueltas-720x540

Gueltas (Suez)

Operational

France

WAGABOX® Model

375 scfm

Commissioning

November 2018

Installed capacity

85,304 MMBtu/year

Distance to pipeline

3.7 miles

Landfill gas composition

CH4

47,60%

N2

13,90%

Hartland

Hartland (CRD)

Operational

Canada

WAGABOX® Model

2000 scfm

Commissioning

May 2025

Installed capacity

341,214 MMBtu/year

Distance to pipeline

-

Landfill gas composition

CH4

44,50%

N2

18,00%

Discover our WAGABOX® technology

This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.