Our projects
Discover our projects
around the world
WAGABOX® units are deployed worldwide through long-term partnerships with landfills and local authorities. New renewable natural gas projects from waste are under development across Europe and North America, helping make renewable gas accessible to more people
95%
Industrial units availability
58
WAGABOX® units worldwide
20 under construction and 38 operational
504k
tons of
of CO₂ equivalent emissions avoided since 2015
7.98 M
MMBtu of
RNG injected since 2015
All of our projects

Polo Industriale Scapigliato (Scapigliato)
Under construction
Italy
WAGABOX® Model
1500 scfm
Commissioning
December 2026
Installed capacity
313,917 MMBtu/year
Distance to pipeline
1.4 miles
Landfill gas composition
CH4
-
N2
-

Site operator
Utility
Gas offtaker

Rockingham County Landfill (Madison, NC)
Under construction
United States
WAGABOX® Model
1000 scfm
Commissioning
October 2025
Installed capacity
204,729 MMBtu/year
Distance to pipeline
2 miles
Landfill gas composition
CH4
-
N2
-

Site operator
Utility
Gas offtaker

Saint-Etienne-des-Grès (Enercycle)
Operational
Canada
WAGABOX® Model
2000 scfm
Commissioning
May 2023
Installed capacity
443,578 MMBtu/year
Distance to pipeline
-
Landfill gas composition
CH4
46,60%
N2
19,80%

Site operator

Utility

Gas offtaker

Saint-Florentin (Coved – Paprec)
Operational
France
WAGABOX® Model
375 scfm
Commissioning
February 2017
Installed capacity
85 304 MMBtu/year
Distance to pipeline
1,9 miles
Landfill gas composition
CH4
45,50%
N2
20,00%

Site operator

Utility

Gas offtaker

Saint-Gaudens (Sivom SGMAM)
Operational
France
WAGABOX® Model
500 scfm
Commissioning
January 2020
Installed capacity
119,425 MMBtu/year
Distance to pipeline
4.5 miles
Landfill gas composition
CH4
41,80%
N2
27,10%

Site operator

Utility