Our projects
Discover our projects
around the world
WAGABOX® units are deployed worldwide through long-term partnerships with landfills and local authorities. New renewable natural gas projects from waste are under development across Europe and North America, helping make renewable gas accessible to more people
95%
WAGABOX® facility availability
57
WAGABOX® units worldwide
19 under construction and 38 operational
504k
tons of
of CO₂ equivalent emissions avoided since 2015
7.98 M
MMBtu of
RNG injected since 2015
All of our projects

Cusset (Suez/Vichy communauté)
Operational
France
WAGABOX® Model
375 scfm
Commissioning
October 2023
Installed capacity
85,304 MMBtu/year
Distance to pipeline
2.7 miles
Landfill gas composition
CH4
43,30%
N2
23,00%

Site operator
Utility

Gas offtaker

Scott Area Landfill (Davenport, IA)
Operational
United States
WAGABOX® Model
1000 scfm
Commissioning
October 2025
Installed capacity
204,729 MMBtu/year
Distance to pipeline
1.6 miles
Landfill gas composition
CH4
47,30%
N2
20,60%

Site operator
Utility
Gas offtaker

Decatur Hills Landfill (Greensburg, IN)
Operational
United States
WAGABOX® Model
1000 scfm
Commissioning
June 2026
Installed capacity
187,668 MMBtu/year
Distance to pipeline
3 miles
Landfill gas composition
CH4
-
N2
-

Site operator
Utility
Gas offtaker

Éteignières (Arcavi)
Operational
France
WAGABOX® Model
375 scfm
Commissioning
April 2024
Installed capacity
85,304 MMBtu/year
Distance to pipeline
-
Landfill gas composition
CH4
41,80%
N2
27,10%

Site operator
Utility
Gas offtaker

Fresnoy-Folny (IKOS / Paprec)
Operational
France
WAGABOX® Model
500 scfm
Commissioning
July 2024
Installed capacity
119,425 MMBtu/year
Distance to pipeline
-
Landfill gas composition
CH4
37,90%
N2
24,40%
