Our projects
Discover our projects
around the world
WAGABOX® units are deployed worldwide through long-term partnerships with landfills and local authorities. New renewable natural gas projects from waste are under development across Europe and North America, helping make renewable gas accessible to more people
95%
Industrial units availability
58
WAGABOX® units worldwide
20 under construction and 38 operational
504k
tons of
of CO₂ equivalent emissions avoided since 2015
7.98 M
MMBtu of
RNG injected since 2015
All of our projects

Cusset (Suez/Vichy communauté)
Operational
France
WAGABOX® Model
375 scfm
Commissioning
October 2023
Installed capacity
85,304 MMBtu/year
Distance to pipeline
2.7 miles
Landfill gas composition
CH4
43,30%
N2
23,00%

Site operator

Utility

Gas offtaker

Scott Area Landfill (Davenport, IA)
Operational
United States
WAGABOX® Model
1000 scfm
Commissioning
October 2025
Installed capacity
204,729 MMBtu/year
Distance to pipeline
1.6 miles
Landfill gas composition
CH4
47.30%
N2
20.60%

Site operator
Utility
Gas offtaker

Decatur Hills Landfill (Greensburg, IN)
Operational
United States
WAGABOX® Model
1000 scfm
Commissioning
June 2026
Installed capacity
187,668 MMBtu/year
Distance to pipeline
3 miles
Landfill gas composition
CH4
48.80%
N2
17.20%

Site operator
Utility
Gas offtaker

Eco-Hill Landfill (Atkinson, IL)
Under construction
United States
WAGABOX® Model
3000 scfm
Commissioning
2028
Installed capacity
610,000 MMBtu/year
Distance to pipeline
Landfill gas composition
CH4
N2

Site operator
Utility
Gas offtaker

Éteignières (Arcavi)
Operational
France
WAGABOX® Model
375 scfm
Commissioning
April 2024
Installed capacity
85,304 MMBtu/year
Distance to pipeline
-
Landfill gas composition
CH4
41,80%
N2
27,10%

Site operator
