Our projects
Discover our projects
around the world
WAGABOX® units are deployed worldwide through long-term partnerships with landfills and local authorities. New renewable natural gas projects from waste are under development across Europe and North America, helping make renewable gas accessible to more people
95%
Industrial units availability
58
WAGABOX® units worldwide
20 under construction and 38 operational
504k
tons of
of CO₂ equivalent emissions avoided since 2015
7.98 M
MMBtu of
RNG injected since 2015
All of our projects

McKean Landfill (East Kane, PA)
Operational
United States
WAGABOX® Model
2000 scfm
Commissioning
June 2026
Installed capacity
375,336 MMBtu/year
Distance to pipeline
1.2 miles
Landfill gas composition
CH4
40.00%
N2
25.00%

Site operator
Utility
Gas offtaker

Milhac-d’Auberoche (Suez)
Operational
France
WAGABOX® Model
375 scfm
Commissioning
November 2022
Installed capacity
85,304 MMBtu/year
Distance to pipeline
11.2 miles
Landfill gas composition
CH4
42,00%
N2
25,90%

Site operator

Utility

Gas offtaker

Miramundo (Bioreciclaje de Cadiz)
Under construction
Spain
WAGABOX® Model
1500 scfm
Commissioning
October 2026
Installed capacity
272,971 MMBtu/year
Distance to pipeline
5.6 miles
Landfill gas composition
CH4
-
N2
-

Site operator

Utility
Gas offtaker

Monflanquin (Valorizon et Avergies)
Operational
France
WAGABOX® Model
250 scfm
Commissioning
January 2026
Installed capacity
40,946 MMBtu/year
Distance to pipeline
0.2 miles
Landfill gas composition
CH4
44,80%
N2
17,90%

Site operator

Utility
Gas offtaker

Montois-la-Montagne (Suez)
Operational
France
WAGABOX® Model
250 scfm
Commissioning
January 2023
Installed capacity
85,304 MMBtu/year
Distance to pipeline
2.8 miles
Landfill gas composition
CH4
40,70%
N2
24,80%

Site operator

Utility