Our projects

Discover our projects
around the world

WAGABOX® units operate globally via long-term partnerships with landfills and authorities, with multiple projects aiming to make biomethane widely accessible

95%

Industrial units availability

5

WAGABOX® units in Canada

4 operational and 1 under construction

504k

tons

of CO₂ equivalent emissions avoided since 2015

8.42 M

GJ of

RNG injected since 2015

All of our projects

Waga_Bath00027-43-720x480

New Bath (Steuben County)

Operational

United States

WAGABOX® Model

1000 scfm

Commissioning

March 2024

Installed capacity

216 000 GJ/year

Distance to pipeline

4,51 km

Landfill gas composition

CH4

44,20%

N2

23,30%

under-construction

Newland Park (Wicomico County)

Under construction

United States

WAGABOX® Model

1000 scfm

Commissioning

-

Installed capacity

223 200 GJ/year

Distance to pipeline

6,44 km

Landfill gas composition

CH4

-

N2

-

under-construction

Ostrom (G2)

Under construction

United States

WAGABOX® Model

2000 scfm

Commissioning

Q1-2027

Installed capacity

442 800 GJ/year

Distance to pipeline

1,61 km

Landfill gas composition

CH4

-

N2

-

Wagabox Pavie (Trigone)

Pavie (Trigone)

Operational

France

WAGABOX® Model

250 scfm

Commissioning

May 2018

Installed capacity

54 000 GJ/year

Distance to pipeline

3 km

Landfill gas composition

CH4

47,50%

N2

14,20%

under-construction

Podere Rota (CSAI)

Under construction

Italy

WAGABOX® Model

500 scfm

Commissioning

September 2026

Installed capacity

104 400 GJ/year

Distance to pipeline

0,58 km

Landfill gas composition

CH4

-

N2

-