Our projects
Discover our projects
around the world
WAGABOX® units operate globally via long-term partnerships with landfills and authorities, with multiple projects aiming to make biomethane widely accessible
95%
Industrial units availability
5
WAGABOX® units in Canada
4 operational and 1 under construction
504k
tons
of CO₂ equivalent emissions avoided since 2015
8.42 M
GJ of
RNG injected since 2015
All of our projects

McKean (Casella)
Operational
United States
WAGABOX® Model
2000 scfm
Commissioning
June 2026
Installed capacity
396 000 GJ/year
Distance to pipeline
2,01 km
Landfill gas composition
CH4
40.00%
N2
25.00%

Site operator
Utility
Gas offtaker

Milhac-d’Auberoche (Suez)
Operational
France
WAGABOX® Model
375 scfm
Commissioning
November 2022
Installed capacity
90 000 GJ/year
Distance to pipeline
November 2022
Landfill gas composition
CH4
42,00%
N2
25,90%

Site operator

Utility
Gas offtaker

Miramundo (Bioreciclaje de Cadiz)
Under construction
Spain
WAGABOX® Model
1500 scfm
Commissioning
October 2026
Installed capacity
288 000 GJ/year
Distance to pipeline
9 km
Landfill gas composition
CH4
-
N2
-

Site operator

Utility
Gas offtaker

Monflanquin (Valorizon et Avergies)
Operational
France
WAGABOX® Model
250 scfm
Commissioning
January 2026
Installed capacity
43 200 GJ/year
Distance to pipeline
0,3 km
Landfill gas composition
CH4
44,80%
N2
17,90%

Site operator

Utility
Gas offtaker

Montois-la-Montagne (Suez)
Operational
France
WAGABOX® Model
375 scfm
Commissioning
January 2023
Installed capacity
90 000 GJ/year
Distance to pipeline
4,5 km
Landfill gas composition
CH4
40,70%
N2
24,80%

Site operator

Utility