Our projects

Discover our projects
around the world

WAGABOX® units operate globally via long-term partnerships with landfills and authorities, with multiple projects aiming to make biomethane widely accessible

95%

WAGABOX® facility availability

5

WAGABOX® units in Canada

4 operational and 1 under construction

504k

tons

of CO₂ equivalent emissions avoided since 2015

2,338

GWh of

biomethane injected since 2015

All of our projects

under-construction

Lanchester (CCSWA)

Under construction

United States

WAGABOX® Model

2000 scfm

Commissioning

Q1-2027

Installed capacity

558 000 GJ/year

Distance to pipeline

0,8 km

Landfill gas composition

CH4

-

N2

-

Image-WB-Milhac-LeHam-720x540

Le Ham (Veolia)

Operational

France

WAGABOX® Model

375 scfm

Commissioning

April 2022

Installed capacity

72 000 GJ/year

Distance to pipeline

6,7 km

Landfill gas composition

CH4

44,70%

N2

19,20%

Image-WB-Ventes-de-Bourse-e1691743810356-720x615

Les Ventes-de-Bourse (Suez)

Operational

France

WAGABOX® Model

375 scfm

Commissioning

January 2020

Installed capacity

90 000 GJ/year

Distance to pipeline

14 km

Landfill gas composition

CH4

40,80%

N2

20,60%

mallard

Mallard-Ridge (Air Liquide)

Operational

United States

WAGABOX® Model

250 scfm

Commissioning

March 2022

Installed capacity

396 000 GJ/year

Distance to pipeline

-

Landfill gas composition

CH4

-

N2

-

under-construction

McKean (Casella)

Operational

United States

WAGABOX® Model

2000 scfm

Commissioning

June 2026

Installed capacity

396 000 GJ/year

Distance to pipeline

2,01 km

Landfill gas composition

CH4

40.00%

N2

25.00%

Discover our WAGABOX®