Our projects
Discover our projects
around the world
WAGABOX® units operate globally via long-term partnerships with landfills and authorities, with multiple projects aiming to make biomethane widely accessible
95%
WAGABOX® facility availability
5
WAGABOX® units in Canada
4 operational and 1 under construction
504k
tons
of CO₂ equivalent emissions avoided since 2015
2,338
GWh of
biomethane injected since 2015
All of our projects

Hillsborough (Hillsborough County)
Under construction
United States
WAGABOX® Model
3000 scfm
Commissioning
Q4-2027
Installed capacity
644 400 GJ/year
Distance to pipeline
4,83 km
Landfill gas composition
CH4
-
N2
-

Site operator
Utility
Gas offtaker

Hyland (Casella)
Operational
United States
WAGABOX® Model
3000 scfm
Commissioning
January 2026
Installed capacity
594 000 GJ/year
Distance to pipeline
2,82 km
Landfill gas composition
CH4
48,50%
N2
19,20%

Site operator
Utility
Gas offtaker

Inzinzac-Lochrist (Lorient-Agglomération)
Operational
France
WAGABOX® Model
250 scfm
Commissioning
November 2019
Installed capacity
54 000 GJ/year
Distance to pipeline
6 km
Landfill gas composition
CH4
46,90%
N2
13,80%

Site operator

Utility

Gas offtaker

Lac-Saint-Jean (RMR)
Under construction
Canada
WAGABOX® Model
1000 scfm
Commissioning
January 2027
Installed capacity
198 000 GJ/year
Distance to pipeline
1,8 km
Landfill gas composition
CH4
-
N2
-

Site operator

Utility
Gas offtaker

Lanchester (CCSWA)
Under construction
United States
WAGABOX® Model
2000 scfm
Commissioning
Q1-2027
Installed capacity
558 000 GJ/year
Distance to pipeline
0,8 km
Landfill gas composition
CH4
-
N2
-
