Our projects
Discover our projects
around the world
WAGABOX® units operate globally via long-term partnerships with landfills and authorities, with multiple projects aiming to make biomethane widely accessible
95%
WAGABOX® facility availability
5
WAGABOX® units in Canada
4 operational and 1 under construction
504k
tons
of CO₂ equivalent emissions avoided since 2015
2,338
GWh of
biomethane injected since 2015
All of our projects

Saint-Etienne-des-Grès (Enercycle)
Operational
Canada
WAGABOX® Model
2000 scfm
Commissioning
May 2023
Installed capacity
468 000 GJ/year
Distance to pipeline
N/A
Landfill gas composition
CH4
46,60%
N2
19,80%

Site operator

Utility

Gas offtaker

Saint-Florentin (Coved – Paprec)
Operational
France
WAGABOX® Model
375 scfm
Commissioning
February 2017
Installed capacity
90 000 GJ/year
Distance to pipeline
3 km
Landfill gas composition
CH4
45,50%
N2
20,00%

Site operator

Utility

Gas offtaker

Saint-Gaudens (Sivom SGMAM)
Operational
France
WAGABOX® Model
500 scfm
Commissioning
January 2020
Installed capacity
126 000 GJ/year
Distance to pipeline
7,2 km
Landfill gas composition
CH4
41,80%
N2
27,10%

Site operator

Utility

Gas offtaker

Saint-Laurent-des-Hommes (SMD3)
Operational
France
WAGABOX® Model
375 scfm
Commissioning
March 2026
Installed capacity
61 200 GJ/year
Distance to pipeline
0,1 km
Landfill gas composition
CH4
46,00%
N2
17,50%

Site operator

Utility
Gas offtaker

Saint-Maximin (Suez)
Operational
France
WAGABOX® Model
375 scfm
Commissioning
June 2017
Installed capacity
90 000 GJ/year
Distance to pipeline
1,2 km
Landfill gas composition
CH4
34,00%
N2
28,30%

Site operator