Our projects
Discover our projects
around the world
WAGABOX® units operate globally via long-term partnerships with landfills and authorities, with multiple projects aiming to make biomethane widely accessible
95%
Industrial units availability
5
WAGABOX® units in Canada
4 operational and 1 under construction
504k
tons
of CO₂ equivalent emissions avoided since 2015
8.42 M
GJ of
RNG injected since 2015
All of our projects

Gournay (SEG)
Operational
France
WAGABOX® Model
375 scfm
Commissioning
January 2022
Installed capacity
90 000 GJ/year
Distance to pipeline
13 km
Landfill gas composition
CH4
42,00%
N2
22,50%

Site operator

Utility

Gas offtaker

Granada (Ecocentral)
Under construction
Spain
WAGABOX® Model
1500 scfm
Commissioning
2027
Installed capacity
288 000 GJ/year
Distance to pipeline
5,2 km
Landfill gas composition
CH4
-
N2
-

Site operator
Utility
Gas offtaker

Granges (Veolia)
Operational
France
WAGABOX® Model
375 scfm
Commissioning
September 2024
Installed capacity
90 000 GJ/year
Distance to pipeline
4,1 km
Landfill gas composition
CH4
41,10%
N2
23,40%

Site operator

Utility
Gas offtaker

Great Oak (Randolph County)
Under construction
United States
WAGABOX® Model
3000 scfm
Commissioning
Installed capacity
644 400 Gj/year
Distance to pipeline
Landfill gas composition
CH4
-
N2
-

Site operator
Utility
Gas offtaker

Gueltas (Suez)
Operational
France
WAGABOX® Model
375 scfm
Commissioning
November 2018
Installed capacity
90 000 GJ/year
Distance to pipeline
6 km
Landfill gas composition
CH4
47,60%
N2
13,90%

Site operator