Our projects

Discover our projects
around the world

WAGABOX® units operate globally via long-term partnerships with landfills and authorities, with multiple projects aiming to make biomethane widely accessible

95%

Industrial units availability

5

WAGABOX® units in Canada

4 operational and 1 under construction

504k

tons

of CO₂ equivalent emissions avoided since 2015

8.42 M

GJ of

RNG injected since 2015

All of our projects

Gournay (SEG)

Operational

France

WAGABOX® Model

375 scfm

Commissioning

January 2022

Installed capacity

90 000 GJ/year

Distance to pipeline

13 km

Landfill gas composition

CH4

42,00%

N2

22,50%

under-construction

Granada (Ecocentral)

Under construction

Spain

WAGABOX® Model

1500 scfm

Commissioning

2027

Installed capacity

288 000 GJ/year

Distance to pipeline

5,2 km

Landfill gas composition

CH4

-

N2

-

WB_Granges-720x449

Granges (Veolia)

Operational

France

WAGABOX® Model

375 scfm

Commissioning

September 2024

Installed capacity

90 000 GJ/year

Distance to pipeline

4,1 km

Landfill gas composition

CH4

41,10%

N2

23,40%

under-construction

Great Oak (Randolph County)

Under construction

United States

WAGABOX® Model

3000 scfm

Commissioning

Installed capacity

644 400 Gj/year

Distance to pipeline

Landfill gas composition

CH4

-

N2

-

Image-WB-Gueltas-720x540

Gueltas (Suez)

Operational

France

WAGABOX® Model

375 scfm

Commissioning

November 2018

Installed capacity

90 000 GJ/year

Distance to pipeline

6 km

Landfill gas composition

CH4

47,60%

N2

13,90%

Discover our WAGABOX®