Our projects
Discover our projects
around the world
WAGABOX® units operate globally via long-term partnerships with landfills and authorities, with multiple projects aiming to make biomethane widely accessible
95%
Industrial units availability
5
WAGABOX® units in Canada
4 operational and 1 under construction
504k
tons
of CO₂ equivalent emissions avoided since 2015
8.42 M
GJ of
RNG injected since 2015
All of our projects

Saint-Laurent-des-Hommes (SMD3)
Operational
France
WAGABOX® Model
375 scfm
Commissioning
March 2026
Installed capacity
61 200 GJ/year
Distance to pipeline
0,1 km
Landfill gas composition
CH4
46,00%
N2
17,50%

Site operator

Utility
Gas offtaker

Saint-Maximin (Suez)
Operational
France
WAGABOX® Model
375 scfm
Commissioning
June 2017
Installed capacity
90 000 GJ/year
Distance to pipeline
1,2 km
Landfill gas composition
CH4
34,00%
N2
28,30%

Site operator

Utility
Gas offtaker

Saint-Palais (Veolia)
Operational
France
WAGABOX® Model
375 scfm
Commissioning
November 2018
Installed capacity
72 000 GJ/year
Distance to pipeline
1,6 km
Landfill gas composition
CH4
44,50%
N2
17,80%

Site operator

Utility
Gas offtaker

Sainte-Marie-Kerque (OPALE / Séché)
Operational
France
WAGABOX® Model
500 scfm
Commissioning
December 2024
Installed capacity
126 000 GJ/year
Distance to pipeline
-
Landfill gas composition
CH4
38,40%
N2
27,70%

Site operator

Utility
Gas offtaker

SECCRA (SECCRA)
Under construction
United States
WAGABOX® Model
1250 scfm
Commissioning
2026
Installed capacity
241 200 GJ/year
Distance to pipeline
1,61 km
Landfill gas composition
CH4
-
N2
-
