Our projects

WAGABOX® units are deployed worldwide through long-term partnerships with landfills and local authorities. Numerous projects to produce renewable natural gas from waste are under development in Europe and North America, with the shared goal of making renewable gas accessible to as many people as possible.

 

Visit a WAGABOX® unit

Spain's first biomethane production plant near Barcelona

WAGABOX® unit of Els Hostalets de Pierola (Can Mata, Spain)
Commissioning
June 2023
Installed capacity
238,849 mmBtu
Site operator
Utility
All of our projects
Operational
WAGABOX® unit of Saint-Palais
Commissioning
November 2018
Installed capacity
68,200 mmBtu
Site operator
Utility
Gas offtaker
Type of site
90,000 tons
Waste stored/year
0.6 miles
Distance to pipeline
Landfill gas composition

40-50%

CH4

O-3%

O2

1000 ppmv

H2S

5-20%

N2

Operational
WAGABOX® unit of Pavie
Commissioning
May 2018
Installed capacity
51,180 mmBtu
Site operator
Utility
Gas offtaker
Type of site
40,000 tons
Waste stored/year
1.8 miles
Distance to pipeline
Landfill gas composition

45%

CH4

0-3%

O2

500 ppmv

H2S

5-25%

N2

Operational
WAGABOX® unit of Saint-Maximin
Commissioning
June 2017
Installed capacity
85,300 mmBtu
Site operator
Utility
Gas offtaker
Type of site
200,000 tons
Waste stored/year
0.7 miles
Distance to pipeline
Landfill gas composition

45-50%

CH4

0-3%

O2

7000 ppmv

H2S

5-20%

N2

Operational
WAGABOX® unit of Saint-Florentin
Commissioning
February 2017
Installed capacity
85,300 mmBtu
Site operator
Utility
Gas offtaker
Type of site
70,000 tons
Waste stored/year
1.8 miles
Distance to pipeline
Landfill gas composition

40-50%

CH4

0-3%

O2

1500

H2S

5-25%

N2

Under construction
WAGABOX® unit of Éteignières (Arcavi)
Commissioning
2023
Installed capacity
37,533 mmBtu
Site operator
Under construction
WAGABOX® unit in Pennsylvania State
Commissioning
2023
Installed capacity
450,000 mmBtu
Site operator
Under construction
WAGABOX® unit of Sainte-Marie-Kerque
Commissioning
2023
Installed capacity
71,654 mmBtu
Site operator
Under construction
WAGABOX® unit of Bath (United States)
Commissioning
2024
Installed capacity
163,782 mmBtu
Site operator
Under construction
WAGABOX® unit of Hartland (Canada)
Commissioning
2024
Installed capacity
341,214 mmBtu
Site operator
Under construction
WAGABOX® unit of Cowansville (Quebec)
Commissioning
2024
Installed capacity
102,364 mmBtu
Site operator
Under construction
WAGABOX® unit of Clermont-Ferrand (Puy-Long)
Commissioning
2024
Installed capacity
426,517 mmBtu
Site operator
Under construction
WAGABOX® unit of Granges
Commissioning
2024
Installed capacity
67,560 mmBtu
Site operator
Under construction
WAGABOX® unit of Chatuzange-le-Goubet
Commissioning
2024
Installed capacity
58,006 mmBtu
Site operator
Under construction
WAGABOX® unit of Iowa State
Commissioning
2025
Installed capacity
204,728 mmBtu
Site operator