Our projects

WAGABOX® units are deployed worldwide through long-term partnerships with landfills and local authorities. Numerous projects to produce renewable natural gas from waste are under development in Europe and North America, with the shared goal of making renewable gas accessible to as many people as possible.

 

Visit a WAGABOX® unit

The first WAGABOX® commissioned in the United-States

WAGABOX® unit in Bath (Steuben County)
Commissioning
15 March 2024
Installed capacity
207,000 mmBtu/year
Site operator
Logo Steuben
Utility
Logo Corning
All of our projects
Operational
WAGABOX® unit of Saint-Étienne-des-Grès (Enercycle)
Commissioning
May 2023
Installed capacity
443,578 mmBtu/year
Site operator
Enercycle logo
Utility
Logo Energir
Gas offtaker
Logo Energir
Type of site
180,000 tons
Waste stored/year
<1 miles
Distance to pipeline
Landfill gas composition

45-50%

CH4

1-3%

O2

0-500 ppmv

H2S

1-25%

N2

Co-funded by
Logo Desjardins
Logo Québec
Operational
WAGABOX® unit of Montois-la-Montagne (Suez)
Commissioning
January 2023
Installed capacity
51,180 mmBtu
Site operator
Logo Suez
Utility
Logo GRDF
Gas offtaker
Logo Ekwateur
Type of site
100,000 tons
Waste stored/year
2.7 miles
Distance to pipeline
Landfill gas composition

40-50%

CH4

0-3%

O2

0-50ppmv

H2S

1-20%

N2

Co-funded by
Logo Meridiam
Operational
WAGABOX® unit of Milhac d’Auberoche (Suez)
Commissioning
November 2022
Installed capacity
85,303 mmBtu
Site operator
Logo Suez
Utility
Logo GRDF
Gas offtaker
Logo Suez
Type of site
105,000 tons
Waste stored/year
11 miles
Distance to pipeline
Landfill gas composition

40-50 %

CH4

0-3 %

O2

0-50

ppmv H2S

1-20 %

N2

Co-funded by
Logo Meridiam
Logo Nouvelle Aquitaine
Operational
WAGABOX® unit of Le Ham (Veolia)
Commissioning
April 2022
Installed capacity
68,242 mmBtu/year
Site operator
Logo Veolia PROJET
Utility
Logo GRDF
Gas offtaker
Logo Engie
Type of site
150,000 tons
Waste stored/year
3.7 miles
Distance to pipeline
Landfill gas composition

40-45%

CH4

3.5%

O2

0-500 ppmv

H2S

1-25%

N2

Operational
WAGABOX® unit of Claye-Souilly (Veolia)
Commissioning
March 2022
Installed capacity
409,000 mmBtu/year
Site operator
Logo Veolia PROJET
Utility
Logo GRDF
Gas offtaker
Logo Engie
Type of site
1,100,000 tons
Waste stored/year
13.5 miles
Distance to pipeline
Landfill gas composition

40-50%

CH4

0.1-3%

O2

0-50

ppmv H2S

1-20%

N2

Operational
WAGABOX® unit of Gournay (SEG)
Commissioning
January 2022
Installed capacity
51,180 mmBtu/year
Site operator
Logo SEG
Utility
Logo GRDF
Gas offtaker
Logo SEG
Type of site
85,000 tons
Waste stored/year
8 miles
Distance to pipeline
Landfill gas composition

45-50%

CH4

0-3%

O2

600 ppmv

H2S

15-20%

N2

Operational
WAGABOX® unit of Blaringhem (Baudelet)
Commissioning
September 2020
Installed capacity
85,300 mmBtu/year
Site operator
Logo Baudelet
Utility
Logo GRDF
Gas offtaker
Logo Baudelet
Type of site
200,000 tons
Waste stored/year
0.4 miles
Distance to pipeline
Landfill gas composition

40-50%

CH4

0-3%

O2

300 ppmv

H2S

5-20%

N2

Operational
WAGABOX® unit of Liéoux (SGMAM)
Commissioning
January 2020
Installed capacity
119,400 mmBtu/year
Site operator
Logo Sivom
Utility
Logo GRDF
Gas offtaker
Logo Provirdis
Type of site
85,000 tons
Waste stored/year
4.3 miles
Distance to pipeline
Landfill gas composition

40-45%

CH4

0-3%

O2

500 ppmv

H2S

5-20%

N2

Co-funded by
Logo Meridiam
Operational
WAGABOX® unit of Les Ventes-de-Bourse (Suez)
Commissioning
January 2020
Installed capacity
85,300 mmBtu/year
Site operator
Logo Suez
Utility
Logo GRDF
Gas offtaker
Logo Suez
Type of site
120,000 tons
Waste stored/year
8.6 miles
Distance to pipeline
Landfill gas composition

40-45%

CH4

0-3%

O2

4000 ppmv

H2S

10-20%

N2

Under construction
WAGABOX® unit in Vacaville (G2)
Commissioning
2026
Installed capacity
630,000 MMBtu/year
Site operator
Operational
WAGABOX® unit of Inzinzac-Lochrist (Lorient Agg)
Commissioning
November 2019
Installed capacity
51,180 mmBtu/year
Site operator
Lorient Agglomeration Logo
Utility
Logo GRDF
Gas offtaker
Logo Dalkia
Type of site
60,000 tons
Waste stored/year
3.7 miles
Distance to pipeline
Landfill gas composition

45-50%

CH4

0-3%

O2

4000 ppmv

H2S

5-20%

N2

Operational
WAGABOX® unit of Chevilly (Suez)
Commissioning
December 2018
Installed capacity
54,180 mmBtu/year
Site operator
Logo Suez
Utility
Logo GRDF
Gas offtaker
Logo Suez
Type of site
60,000 tons
Waste stored/year
3.7 miles
Distance to pipeline
Landfill gas composition

45-50%

CH4

0-3%

O2

4000 ppmv

H2S

5-20%

N2

Operational
WAGABOX® unit of Gueltas (Suez)
Commissioning
November 2018
Installed capacity
85,300 mmBtu/year
Site operator
Logo Suez
Utility
Logo GRDF
Gas offtaker
Logo Suez
Type of site
200,000 tons
Waste stored/year
3.7 miles
Distance to pipeline
Landfill gas composition

45-50%

CH4

3.5%

O2

1000 ppmv

H2S

5-20%

N2

Operational
WAGABOX® unit of Saint-Palais (Veolia)
Commissioning
November 2018
Installed capacity
68,200 mmBtu/year
Site operator
Logo Veolia PROJET
Utility
Logo GRDF
Gas offtaker
Logo Dalkia
Type of site
90,000 tons
Waste stored/year
0.6 miles
Distance to pipeline
Landfill gas composition

40-50%

CH4

O-3%

O2

1000 ppmv

H2S

5-20%

N2