Our projects

WAGABOX® units are deployed worldwide through long-term partnerships with landfills and local authorities. Numerous projects to produce renewable natural gas from waste are under development in Europe and North America, with the shared goal of making renewable gas accessible to as many people as possible.

 

Visit a WAGABOX® unit

The first WAGABOX® commissioned in the United-States

WAGABOX® unit in Bath (Steuben County)
Commissioning
15 March 2024
Installed capacity
207,000 mmBtu/year
Site operator
Logo Steuben
Utility
Logo Corning
All of our projects
Under construction
WAGABOX® unit in Monflanquin (Valorizon/Avergies)
Commissioning
2027
Installed capacity
41,000 MMBtu
Site operator
Under construction
WAGABOX® unit of Short Mountain (Lane County)
Commissioning
2027
Installed capacity
407,000 MMBtu/year
Site operator
Under construction
WAGABOX® unit of Hillsborough (Hillsborough County)
Commissioning
2027
Installed capacity
610,000 MMBtu/year
Site operator
Under construction
WAGABOX® unit of Newland Park (Wicomico County)
Commissioning
2027
Installed capacity
210,000 MMBtu/year
Site operator
Under construction
WAGABOX® unit of McKean (Casella Waste Systems)
Commissioning
2026
Installed capacity
375,336 mmBtu/year
Site operator
Under construction
WAGABOX® unit of Chemung (Casella Waste Systems)
Commissioning
2025
Installed capacity
563,003 mmBtu/year
Site operator
Under construction
WAGABOX® unit in Osignano Marittimo (Scapigliato)
Commissioning
2027
Installed capacity
314,000 MMBtu
Site operator
Under construction
WAGABOX® unit in Aix-en-Provence (Aix-Marseille-Provence)
Commissioning
2026
Installed capacity
188,000 MMBtu/year
Site operator
Under construction
WAGABOX® unit in Bakersfield (Kern County)
Installed capacity
550,000 MMBtu
Site operator
Under construction
WAGABOX® unit in Wheatland (G2)
Commissioning
2026
Installed capacity
420,000 MMBtu/year
Site operator
Under construction
WAGABOX® unit in West Grove (SECCRA)
Commissioning
2026
Installed capacity
229,000 MMBtu/year
Site operator