Our projects around the world

Around twenty WAGABOX® units are in operation around the world, thanks to long-term partnerships with private operators of landfill sites and local authorities. 

 

Numerous projects to produce biomethane from waste are under development in Europe and North America, with the ambition, which we share with our partners, of making renewable gas accessible to as many people as possible. 

 

Visit a WAGABOX® unit

The first biomethane production plant in Spain, near Barcelona

WAGABOX® unit in Els Hostalets de Pierola (Can Mata, Spain)
Commissioning
June 2023
Installed capacity
70 GWh/year
Site operator
PREZERO logo projet
Network operator
NEDGIA logo projet
All our projects
Operational
WAGABOX® unit in Granges
Commissioning
September 26, 2024
Installed capacity
25 GWh/year
Site operator
Logo Veolia PROJET
Network operator
Logo GRDF
Type of site
130,000 tons
Landfill/year
4.1 km
Distance to network
Biogas composition

43%

CH4

50 ppm

H2S

Operational
WAGABOX® unit in Cowansville (Quebec)
Commissioning
July 16, 2024
Installed capacity
30 GWh/year
Site operator
Zone Eco Logo
Network operator
Logo Energir
Biogas composition

45 %

CH4

900 ppm

H2S

Operational
WAGABOX® unit in Éteignières (Arcavi)
Commissioning
April 26, 2024
Installed capacity
25 GWh/year
Site operator
LOGO ARCAVI
Network operator
Logo GRDF
Type of site
120 000 tons
Landfill/year
Biogas composition

43%

CH4

30 ppm

H2S

Operational
WAGABOX® unit in Chatuzange-le-Goubet
Commissioning
11 April 2024
Installed capacity
25 GWh/year
Site operator
Logo Veolia PROJET
Network operator
Logo GRDF
Type of site
150,000 tons
Landfill/year
Biogas composition

40%

CH4

Operational
WAGABOX® unit in Bath (United States)
Commissioning
15 March 2024
Installed capacity
60 GWh/year
Site operator
Logo Steuben
Network operator
Logo Corning
Type of site
280 000 tons
Landfill/year
Biogas composition

50%

CH4

1100 PPMV

H2S

Operational
WAGABOX® unit in Sainte-Marie-Kerque (France)
Commissioning
2023
Installed capacity
21 GWh/year
Site operator
Logo Séche Environnement
Network operator
Logo GRDF
Type of site
50 000 tons
Landfill/year
4,9 miles
Distance to network
Biogas composition

41%

CH4

50 ppm

H2S

Operational
WAGABOX® unit of Chicoutimi (Quebec)
Commissioning
December 2023
Installed capacity
16 GWh/year
Site operator
Logo Matrec
Network operator
Logo Energir
Type of site
<1 mile
Distance to network
Biogas composition

50%

CH4

1,000-2,000 ppmv

H2S

Co-funded by
Logo Québec
Operational
WAGABOX® unit in Cusset (Gaia)
Commissioning
October 2023
Installed capacity
17 GWh/year
Site operator
Logo Suez
Network operator
Logo GRDF
Gas offtaker
Logo Engie
Type of site
90,000 tonnes
Landfill/year
2.4 miles
Distance to network
Biogas composition

42%

CH4

0-3%

O2

50 ppmv

H2S

15-20%

O2

Operational
WAGABOX® unit in Els Hostalets de Pierola (Can Mata, Spain)
Commissioning
June 2023
Installed capacity
70 GWh/year
Site operator
PREZERO logo projet
Network operator
NEDGIA logo projet
Type of site
70,000 tonnes
Landfill/year
3.7 miles
Distance to network
Biogas composition

42-45%

CH4

1-2%

O2

0-50 ppmv

H2S

10-22%

N2

Co-funded by
Logo Funded by EU
Operational
WAGABOX® unit in Saint-Étienne-des-Grès (Quebec)
Commissioning
May 2023
Installed capacity
130 GWh/year
Site operator
Enercycle logo
Network operator
Logo Energir
Gas offtaker
Logo Energir
Type of site
180,000 tonnes
Landfill/year
<1 miles
Distance to network
Biogas composition

45-50%

CH4

1-3%

O2

0-500 ppmv

H2S

1-25%

N2

Co-funded by
Logo Desjardins
Logo Québec
Operational
WAGABOX® unit in Montois-la-Montagne
Commissioning
January 2023
Installed capacity
20 GWh/year
Site operator
Logo Suez
Network operator
Logo GRDF
Gas offtaker
Logo Ekwateur
Type of site
100,000 tonnes
Landfill/year
2.4 miles
Distance to network
Biogas composition

40-50%

CH4

0-3%

O2

0-50ppmv

H2S

1-20%

N2

Co-funded by
Logo Meridiam
Operational
WAGABOX® unit in Bassilac and Auberoche (Madaillan)
Commissioning
November 2022
Installed capacity
25 GWh/year
Site operator
Logo Suez
Network operator
Logo GRDF
Gas offtaker
Logo Suez
Type of site
105,000 tonnes
Landfill/year
11 miles
Distance to network
Biogas composition

40-50 %

CH4

0-3 %

O2

0-50

ppmv H2S

1-20 %

N2

Co-funded by
Logo Meridiam
Logo Nouvelle Aquitaine
Operational
WAGABOX® unit in Le Ham
Commissioning
April 2022
Installed capacity
20 GWh/year
Site operator
Logo Veolia PROJET
Network operator
Logo GRDF
Gas offtaker
Logo Engie
Type of site
150,000 tonnes
Landfill/year
3.7 miles
Distance to network
Biogas composition

40-45%

CH4

3.5%

O2

0-500 ppmv

H2S

1-25%

N2

Operational
WAGABOX® unit in Claye-Souilly (La REP)
Commissioning
March 2022
Installed capacity
120 GWh/year
Site operator
Logo Veolia PROJET
Network operator
Logo GRDF
Gas offtaker
Logo Engie
Type of site
1,100,000 tonnes
Landfill/year
13 miles
Distance to network
Biogas composition

40-50%

CH4

0.1-3%

O2

0-50

ppmv H2S

1-20%

N2