Our projects around the world

Around twenty WAGABOX® units are in operation around the world, thanks to long-term partnerships with private operators of landfill sites and local authorities. 

 

Numerous projects to produce biomethane from waste are under development in Europe and North America, with the ambition, which we share with our partners, of making renewable gas accessible to as many people as possible. 

 

Visit a WAGABOX® unit

The first biomethane production plant in Spain, near Barcelona

WAGABOX® unit in Els Hostalets de Pierola (Can Mata, Spain)
Commissioning
June 2023
Installed capacity
70 GWh/year
Site operator
Network operator
All our projects
Operational
WAGABOX® unit in St-Gaudens (Liéoux)
Commissioning
January 2020
Installed capacity
25 GWh/year
Site operator
Network operator
Gas offtaker
Type of site
85,000 tonnes
Landfill/year
4.3 miles
Distance to network
Biogas composition

40-45%

CH4

0-3%

O2

500 ppmv

H2S

5-20%

N2

Co-funded by
Operational
WAGABOX® unit in Ventes-de-Bourses
Commissioning
January 2020
Installed capacity
25 GWh/year
Site operator
Network operator
Gas offtaker
Type of site
120,000 tonnes
Landfill/year
8.6 miles
Distance to network
Biogas composition

40-45%

CH4

0-3%

O2

4000 ppmv

H2S

10-20%

N2

Operational
WAGABOX® unit in Inzinzac-Lochrist (Kermat)
Commissioning
November 2019
Installed capacity
15 GWh/year
Site operator
Network operator
Gas offtaker
Type of site
60,000 tonnes
Landfill/year
3.7 miles
Distance to network
Biogas composition

45-50%

CH4

0-3%

O2

4000 ppmv

H2S

5-20%

N2

Operational
WAGABOX® unit in Chevilly
Commissioning
December 2018
Installed capacity
15 GWh/year
Site operator
Network operator
Gas offtaker
Type of site
60,000 tonnes
Landfill/year
3.7 miles
Distance to network
Biogas composition

45-50%

CH4

0-3%

O2

4000 ppmv

H2S

5-20%

N2

Operational
WAGABOX® unit in Gueltas
Commissioning
November 2018
Installed capacity
25 GWh/year
Site operator
Network operator
Gas offtaker
Type of site
200,000 tonnes
Landfill/year
3.7 miles
Distance to network
Biogas composition

45-50%

CH4

3.5%

O2

1000 ppmv

H2S

5-20%

N2

Operational
WAGABOX® unit in Saint-Palais
Commissioning
November 2018
Installed capacity
20 GWh/year
Site operator
Network operator
Gas offtaker
Type of site
90,000 tonnes
Landfill/year
0.6 miles
Distance to network
Biogas composition

40-50%

CH4

O-3%

O2

1000 ppmv

H2S

5-20%

N2

Operational
WAGABOX® unit in Pavie
Commissioning
May 2018
Installed capacity
15 GWh/year
Site operator
Network operator
Gas offtaker
Type of site
40,000 tonnes
Landfill/year
1.8 miles
Distance to network
Biogas composition

45%

CH4

0-3%

O2

500 ppmv

H2S

5-25%

N2

Operational
WAGABOX® unit in Saint-Maximin
Commissioning
June 2017
Installed capacity
25 GWh/year
Site operator
Network operator
Gas offtaker
Type of site
200,000 tonnes
Landfill/year
0.6 miles
Distance to network
Biogas composition

45-50%

CH4

0-3%

O2

7000 ppmv

H2S

5-20%

N2

Operational
WAGABOX® unit in Saint-Florentin
Commissioning
February 2017
Installed capacity
25 GWh/year
Site operator
Network operator
Gas offtaker
Type of site
70,000 tonnes
Landfill/year
1.8 miles
Distance to network
Biogas composition

40-50%

CH4

0-3%

O2

1500

H2S

5-25%

N2

Under construction
WAGABOX® unit in Hartland (Canada)
Commissioning
2024
Installed capacity
100 GWh/year
Site operator
Under construction
WAGABOX® unit in Cowansville (Quebec)
Commissioning
2024
Installed capacity
30 GWh/year
Site operator
Under construction
WAGABOX® unit in Pennsylvania State
Commissioning
2023
Installed capacity
130 GWh/year
Site operator
Under construction
WAGABOX® unit in Iowa State
Commissioning
2025
Installed capacity
60 GWh/year
Site operator
Under construction
WAGABOX® unit in Clermont-Ferrand (Puy-Long)
Commissioning
2024
Installed capacity
125 GWh/year
Site operator