Our projects around the world

Around twenty WAGABOX® units are in operation around the world, thanks to long-term partnerships with private operators of landfill sites and local authorities. 

 

Numerous projects to produce biomethane from waste are under development in Europe and North America, with the ambition, which we share with our partners, of making renewable gas accessible to as many people as possible. 

 

Visit a WAGABOX® unit

The first biomethane production plant in Spain, near Barcelona

WAGABOX® unit in Els Hostalets de Pierola (Can Mata, Spain)
Commissioning
June 2023
Installed capacity
70 GWh/year
Site operator
PREZERO logo projet
Network operator
NEDGIA logo projet
All our projects
Operational
WAGABOX® unit in Saint-Palais (Veolia)
Commissioning
November 2018
Installed capacity
20 GWh/year
Site operator
Logo Veolia PROJET
Network operator
Logo GRDF
Gas offtaker
Logo Dalkia
Type of site
90,000 tonnes
Landfill/year
0.6 miles
Distance to network
Biogas composition

40-50%

CH4

O-3%

O2

1000 ppmv

H2S

5-20%

N2

Operational
WAGABOX® unit in Pavie (Trigone)
Commissioning
May 2018
Installed capacity
15 GWh/year
Site operator
Logo Trigone
Network operator
Logo GRDF
Type of site
40,000 tonnes
Landfill/year
1.8 miles
Distance to network
Biogas composition

45%

CH4

0-3%

O2

500 ppmv

H2S

5-25%

N2

Operational
WAGABOX® unit in Saint-Maximin (Suez)
Commissioning
June 2017
Installed capacity
25 GWh/year
Site operator
Logo Suez
Network operator
Logo GRDF
Gas offtaker
Logo Suez
Type of site
200,000 tonnes
Landfill/year
0.6 miles
Distance to network
Biogas composition

45-50%

CH4

0-3%

O2

7000 ppmv

H2S

5-20%

N2

Operational
WAGABOX® unit in Saint-Florentin (Coved)
Commissioning
February 2017
Installed capacity
25 GWh/year
Site operator
Logo Paprec
Network operator
Logo GRDF
Type of site
70,000 tonnes
Landfill/year
1.8 miles
Distance to network
Biogas composition

40-50%

CH4

0-3%

O2

1500

H2S

5-25%

N2

Operational
WAGABOX® unit in Clermont-Ferrand (Valtom)
Commissioning
2024
Installed capacity
125 GWh/year
Site operator
Logo Valtom
Under construction
WAGABOX® unit in Lanchester (CCSWA)
Commissioning
2025
Installed capacity
130 GWh/year
Site operator
Logo Pennsylvania States
Operational
WAGABOX® unit in Hartland (CRD)
Commissioning
2024
Installed capacity
100 GWh/year
Site operator
Logo CRD
Network operator
Operational
WAGABOX® unit in Davenport (W.C. Scott County)
Commissioning
2025
Installed capacity
60 GWh/year
Site operator
Waste Commission of Scott County Logo
Under construction
WAGABOX® unit of Madison (Rockingham County)
Commissioning
2026
Installed capacity
60 GWh/an
Site operator
Logo Rockingham
Under construction
WAGABOX® unit of Greensburg, Indiana (Decatur Hills)
Commissioning
2026
Installed capacity
55 GWh/an
Site operator
Logo Decatur Hills, Inc.
Under construction
WAGABOX® unit of Hébertville-Station (RMR)
Commissioning
2026
Installed capacity
55 GWh/an
Site operator
Under construction
WAGABOX® unit of Piantravigne (CSAI)
Commissioning
2026
Installed capacity
29 GWh/an
Site operator
Under construction
WAGABOX® unit of Beaumont (Texas)
Commissioning
2025
Installed capacity
100 GWh/year
Site operator
Under construction
WAGABOX® unit of Saint-Laurent-des-Hommes (SMD3)
Commissioning
2027
Installed capacity
16,7 GWh/an
Site operator