Our projects

Discover our projects
around the world

WAGABOX® units operate globally via long-term partnerships with landfills and authorities, with multiple projects aiming to make biomethane widely accessible

95%

WAGABOX® facility availability

56

WAGABOX® units worldwide

20 under construction and 36 operational

504k

tons

of CO₂ equivalent emissions avoided since 2015

2,338

GWh of

biomethane injected since 2015

All of our projects

under-construction

McKean (Casella)

Operational

United States

WAGABOX® Model

3200 m3/h

Commissioning

June 2026

Installed capacity

110 GWh/year

Distance to pipeline

2,01 km

Landfill gas composition

CH4

40.00%

N2

25.00%

Image-WB-Milhac-dAuberoche-e1690216542964-720x527

Milhac-d’Auberoche (Suez)

Operational

France

WAGABOX® Model

-

Commissioning

November 2022

Installed capacity

25 GWh/year

Distance to pipeline

18 km

Landfill gas composition

CH4

42,00%

N2

25,90%

under-construction

Miramundo (Bioreciclaje de Cadiz)

Under construction

Spain

WAGABOX® Model

2400 m3/h

Commissioning

October 2026

Installed capacity

80 GWh/year

Distance to pipeline

9 km

Landfill gas composition

CH4

-

N2

-

Media-7-1-720x540

Monflanquin (Valorizon et Avergies)

Operational

France

WAGABOX® Model

-

Commissioning

January 2026

Installed capacity

12 GWh/year

Distance to pipeline

0,3 km

Landfill gas composition

CH4

44,80%

N2

17,90%

Montois

Montois-la-Montagne (Suez)

Operational

France

WAGABOX® Model

-

Commissioning

January 2023

Installed capacity

25 GWh/year

Distance to pipeline

4,5 km

Landfill gas composition

CH4

40,70%

N2

24,80%

Discover our WAGABOX® Technology