Our projects
Discover our projects
around the world
WAGABOX® units operate globally via long-term partnerships with landfills and authorities, with multiple projects aiming to make biomethane widely accessible
95%
WAGABOX® facility availability
57
WAGABOX® units worldwide
19 under construction and 38 operational
504k
tons of
of CO₂ equivalent emissions avoided since 2015
2,338
GWh of
biomethane injected since 2015
All of our projects

Le Ham (Veolia)
Operational
France
WAGABOX® Model
-
Commissioning
April 2022
Installed capacity
20 GWh/year
Distance to pipeline
6,7 km
Landfill gas composition
CH4
44,70%
N2
19,20%

Site operator

Utility

Gas offtaker

Les Ventes-de-Bourse (Suez)
Operational
France
WAGABOX® Model
-
Commissioning
January 2020
Installed capacity
25 GWh/year
Distance to pipeline
14 km
Landfill gas composition
CH4
40,80%
N2
20,60%

Site operator

Utility
Gas offtaker

Mallard-Ridge (Air Liquide)
Operational
United States
WAGABOX® Model
-
Commissioning
March 2022
Installed capacity
110 GWh/year
Distance to pipeline
-
Landfill gas composition
CH4
-
N2
-
Site operator
Utility
Gas offtaker

McKean (Casella)
Operational
United States
WAGABOX® Model
3200 m3/h
Commissioning
June 2026
Installed capacity
110 GWh/year
Distance to pipeline
2,01 km
Landfill gas composition
CH4
40.00%
N2
25.00%

Site operator
Utility
Gas offtaker

Milhac-d’Auberoche (Suez)
Operational
France
WAGABOX® Model
-
Commissioning
November 2022
Installed capacity
25 GWh/year
Distance to pipeline
18 km
Landfill gas composition
CH4
42,00%
N2
25,90%

Site operator
