Our projects

Discover our projects
around the world

WAGABOX® units operate globally via long-term partnerships with landfills and authorities, with multiple projects aiming to make biomethane widely accessible

95%

WAGABOX® facility availability

57

WAGABOX® units worldwide

19 under construction and 38 operational

504k

tons of

of CO₂ equivalent emissions avoided since 2015

2,338

GWh of

biomethane injected since 2015

All of our projects

Image-WB-Milhac-LeHam-720x540

Le Ham (Veolia)

Operational

France

WAGABOX® Model

-

Commissioning

April 2022

Installed capacity

20 GWh/year

Distance to pipeline

6,7 km

Landfill gas composition

CH4

44,70%

N2

19,20%

Image-WB-Ventes-de-Bourse-e1691743810356-720x615

Les Ventes-de-Bourse (Suez)

Operational

France

WAGABOX® Model

-

Commissioning

January 2020

Installed capacity

25 GWh/year

Distance to pipeline

14 km

Landfill gas composition

CH4

40,80%

N2

20,60%

mallard

Mallard-Ridge (Air Liquide)

Operational

United States

WAGABOX® Model

-

Commissioning

March 2022

Installed capacity

110 GWh/year

Distance to pipeline

-

Landfill gas composition

CH4

-

N2

-

under-construction

McKean (Casella)

Operational

United States

WAGABOX® Model

3200 m3/h

Commissioning

June 2026

Installed capacity

110 GWh/year

Distance to pipeline

2,01 km

Landfill gas composition

CH4

40.00%

N2

25.00%

Image-WB-Milhac-dAuberoche-e1690216542964-720x527

Milhac-d’Auberoche (Suez)

Operational

France

WAGABOX® Model

-

Commissioning

November 2022

Installed capacity

25 GWh/year

Distance to pipeline

18 km

Landfill gas composition

CH4

42,00%

N2

25,90%

Discover our WAGABOX® Technology