Our projects
Discover our projects
around the world
WAGABOX® units operate globally via long-term partnerships with landfills and authorities, with multiple projects aiming to make biomethane widely accessible
95%
WAGABOX® facility availability
58
WAGABOX® units worldwide
20 under construction and 38 operational
504k
tons of
of CO₂ equivalent emissions avoided since 2015
2,338
GWh of
biomethane injected since 2015
All of our projects

Newland Park (Wicomico County)
Operational
United States
WAGABOX® Model
1600 m3/h
Commissioning
-
Installed capacity
62 GWh/year
Distance to pipeline
6,44 km
Landfill gas composition
CH4
-
N2
-

Site operator
Utility
Gas offtaker

Ostrom (G2)
Under construction
United States
WAGABOX® Model
3200 m3/h
Commissioning
Q1-2027
Installed capacity
185 GWh/year
Distance to pipeline
1,61 km
Landfill gas composition
CH4
-
N2
-

Site operator
Utility
Gas offtaker
Pavie (Trigone)
Operational
France
WAGABOX® Model
-
Commissioning
May 2018
Installed capacity
15 GWh/year
Distance to pipeline
3 km
Landfill gas composition
CH4
47,50%
N2
14,20%

Site operator

Utility

Gas offtaker

Podere Rota (CSAI)
Under construction
Italy
WAGABOX® Model
-
Commissioning
September 2026
Installed capacity
29 GWh/year
Distance to pipeline
0,58 km
Landfill gas composition
CH4
-
N2
-

Site operator
Utility
Gas offtaker

Polo Industriale Scapigliato (Scapigliato)
Under construction
Italy
WAGABOX® Model
2400 m3/h
Commissioning
December 2026
Installed capacity
92 GWh/year
Distance to pipeline
2,3 km
Landfill gas composition
CH4
-
N2
-
