Our projects

Discover our projects
around the world

WAGABOX® units operate globally via long-term partnerships with landfills and authorities, with multiple projects aiming to make biomethane widely accessible

95%

WAGABOX® facility availability

58

WAGABOX® units worldwide

20 under construction and 38 operational

504k

tons of

of CO₂ equivalent emissions avoided since 2015

2,338

GWh of

biomethane injected since 2015

All of our projects

Wagabox Saint-Maximin, Oise

Saint-Maximin (Suez)

Operational

France

WAGABOX® Model

-

Commissioning

June 2017

Installed capacity

25 GWh/year

Distance to pipeline

1,2 km

Landfill gas composition

CH4

34,00%

N2

28,30%

Image-WB-Saint-Palais-720x540

Saint-Palais (Veolia)

Operational

France

WAGABOX® Model

-

Commissioning

November 2018

Installed capacity

20 GWh/year

Distance to pipeline

1,6 km

Landfill gas composition

CH4

44,50%

N2

17,80%

Sainte-Marie-Kerque

Sainte-Marie-Kerque (OPALE / Séché)

Operational

France

WAGABOX® Model

-

Commissioning

December 2024

Installed capacity

35 GWh/year

Distance to pipeline

-

Landfill gas composition

CH4

38,40%

N2

27,70%

under-construction

SECCRA (SECCRA)

Under construction

United States

WAGABOX® Model

2000 m3/h

Commissioning

2026

Installed capacity

67 GWh/year

Distance to pipeline

1,61 km

Landfill gas composition

CH4

-

N2

-

Septèmes-les-Vallons

Septèmes-les-Vallons (Veolia)

Operational

France

WAGABOX® Model

-

Commissioning

June 2024

Installed capacity

25 GWh/year

Distance to pipeline

1,8 km

Landfill gas composition

CH4

41,10%

N2

20,20%

Discover our WAGABOX® Technology