Our projects
Discover our projects
around the world
WAGABOX® units operate globally via long-term partnerships with landfills and authorities, with multiple projects aiming to make biomethane widely accessible
95%
WAGABOX® facility availability
58
WAGABOX® units worldwide
20 under construction and 38 operational
504k
tons of
of CO₂ equivalent emissions avoided since 2015
2,338
GWh of
biomethane injected since 2015
All of our projects

Rockingham (Rockingham County)
Under construction
United States
WAGABOX® Model
1600 m3/h
Commissioning
2026
Installed capacity
60 GWh/year
Distance to pipeline
3,22 km
Landfill gas composition
CH4
-
N2
-

Site operator
Utility
Gas offtaker

Saint-Etienne-des-Grès (Enercycle)
Operational
Canada
WAGABOX® Model
3400 m3/h
Commissioning
May 2023
Installed capacity
130 GWh/year
Distance to pipeline
N/A
Landfill gas composition
CH4
46,60%
N2
19,80%

Site operator

Utility

Gas offtaker

Saint-Florentin (Coved – Paprec)
Operational
France
WAGABOX® Model
600 m3/h
Commissioning
February 2017
Installed capacity
25 GWh/year
Distance to pipeline
3 km
Landfill gas composition
CH4
45,50%
N2
20,00%

Site operator

Utility

Gas offtaker

Saint-Gaudens (Sivom SGMAM)
Operational
France
WAGABOX® Model
-
Commissioning
January 2020
Installed capacity
35 GWh/year
Distance to pipeline
7,2 km
Landfill gas composition
CH4
41,80%
N2
27,10%

Site operator

Utility

Gas offtaker

Saint-Laurent-des-Hommes (SMD3)
Operational
France
WAGABOX® Model
-
Commissioning
March 2026
Installed capacity
17 GWh/year
Distance to pipeline
0,1 km
Landfill gas composition
CH4
46,00%
N2
17,50%

Site operator
