Our projects

WAGABOX® units are deployed worldwide through long-term partnerships with landfills and local authorities. Numerous projects to produce renewable natural gas from waste are under development in Europe and North America, with the shared goal of making renewable gas accessible to as many people as possible.

 

Visit a WAGABOX® unit

Quebec's first WAGABOX® unit

WAGABOX® unit of Saint-Étienne-des-Grès (Quebec)
Commissioning
May 2023
Installed capacity
468,000 GJ/year
Site operator
Enercycle logo
Utility
Logo Energir
Gas offtaker
Logo Energir
All of our projects
Operational
WAGABOX® unit of Cowansville (Quebec)
Commissioning
July 16, 2024
Installed capacity
108,000 GJ/year
Site operator
Zone Eco Logo
Utility
Logo Energir
Landfill gas composition

45 %

CH4

900 ppm

H2S

Operational
WAGABOX® unit of Éteignières (Arcavi)
Commissioning
April 26, 2024
Installed capacity
39,600 GJ/year
Site operator
LOGO ARCAVI
Utility
Logo GRDF
Type of site
120 000 tons
Waste stored/year
Landfill gas composition

43%

CH4

30 ppm

H2S

Operational
WAGABOX® unit of Chatuzange-le-Goubet
Commissioning
11 April 2024
Installed capacity
61,200 GJ/year
Site operator
Logo Veolia PROJET
Utility
Logo GRDF
Type of site
150 000 tons
Waste stored/year
Landfill gas composition

40 %

CH4

Operational
WAGABOX® unit of Bath (United States)
Commissioning
15 March 2024
Installed capacity
216,000 GJ/year
Site operator
Logo Steuben
Utility
Logo Corning
Type of site
280 000 tons
Waste stored/year
Landfill gas composition

50 %

CH4

1100 PPMV

H2S

Operational
WAGABOX® unit of Sainte-Marie-Kerque
Commissioning
January 2024
Installed capacity
75,600 GJ/year
Site operator
Logo Séche Environnement
Utility
Logo GRDF
Type of site
50 000 tons
Waste stored/year
4,9 miles
Distance to pipeline
Landfill gas composition

41%

CH4

50 ppm

H2S

Operational
WAGABOX® unit of Chicoutimi (Quebec)
Commissioning
December 2023
Installed capacity
60,000 GJ/year
Site operator
Logo Matrec
Utility
Logo Energir
Type of site
<1 mile
Distance to pipeline
Landfill gas composition

50%

CH4

1,000-2,000 ppmv

H2S

Co-funded by
Logo Québec
Operational
WAGABOX® unit of Cusset (Gaïa)
Commissioning
October 2023
Installed capacity
468,000 GJ/year
Site operator
Logo Suez
Utility
Logo GRDF
Gas offtaker
Logo Engie
Type of site
90,000 tonnes
Waste stored/year
2.4 miles
Distance to pipeline
Landfill gas composition

42%

CH4

0-3%

O2

50 ppmv

H2S

15-20%

N2

Operational
WAGABOX® unit of Els Hostalets de Pierola (Can Mata, Spain)
Commissioning
June 2023
Installed capacity
252,000 GJ/year
Site operator
PREZERO logo projet
Utility
NEDGIA logo projet
Type of site
70,000 tonnes
Waste stored/year
3.7 miles
Distance to pipeline
Landfill gas composition

42-45%

CH4

1-2%

O2

0-50 ppmv

H2S

10-22%

N2

Co-funded by
Logo Funded by EU
Operational
WAGABOX® unit of Saint-Étienne-des-Grès (Quebec)
Commissioning
May 2023
Installed capacity
468,000 GJ/year
Site operator
Enercycle logo
Utility
Logo Energir
Gas offtaker
Logo Energir
Type of site
180,000 tonnes
Waste stored/year
<1 miles
Distance to pipeline
Landfill gas composition

45-50%

CH4

1-3%

O2

0-500 ppmv

H2S

1-25%

N2

Co-funded by
Logo Desjardins
Logo Québec
Operational
WAGABOX® unit of Montois-la-Montagne
Commissioning
January 2023
Installed capacity
54,000 GJ/year
Site operator
Logo Suez
Utility
Logo GRDF
Gas offtaker
Logo Ekwateur
Type of site
100,000 tonnes
Waste stored/year
2.7 miles
Distance to pipeline
Landfill gas composition

40-50%

CH4

0-3%

O2

0-50ppmv

H2S

1-20%

N2

Co-funded by
Logo Mediriam
Operational
WAGABOX® unit of Bassilac et Auberoche (Madaillan)
Commissioning
November 2022
Installed capacity
90,000 GJ/year
Site operator
Logo Suez
Utility
Logo GRDF
Gas offtaker
Logo Suez
Type of site
105,000 tonnes
Waste stored/year
11 miles
Distance to pipeline
Landfill gas composition

40-50 %

CH4

0-3 %

O2

0-50

ppmv H2S

1-20 %

N2

Co-funded by
Logo Mediriam
Logo Nouvelle Aquitaine
Operational
WAGABOX® unit of Le Ham
Commissioning
April 2022
Installed capacity
72,000 GJ/year
Site operator
Logo Veolia PROJET
Utility
Logo GRDF
Gas offtaker
Logo Engie
Type of site
150,000 tonnes
Waste stored/year
3.7 miles
Distance to pipeline
Landfill gas composition

40-45%

CH4

3.5%

O2

0-500 ppmv

H2S

1-25%

N2

Operational
WAGABOX® unit of Claye-Souilly
Commissioning
March 2022
Installed capacity
431,517 GJ/year
Site operator
Logo Veolia PROJET
Utility
Logo GRDF
Gas offtaker
Logo Engie
Type of site
1,100,000 tonnes
Waste stored/year
13.5 miles
Distance to pipeline
Landfill gas composition

40-50%

CH4

0.1-3%

O2

0-50

ppmv H2S

1-20%

N2

Operational
WAGABOX® unit of Gournay
Commissioning
January 2022
Installed capacity
54,000 GJ/year
Site operator
Logo SEG
Utility
Logo GRDF
Gas offtaker
Logo SEG
Type of site
85,000 tonnes
Waste stored/year
8 miles
Distance to pipeline
Landfill gas composition

45-50%

CH4

0-3%

O2

600 ppmv

H2S

15-20%

N2