Our projects

WAGABOX® units are deployed worldwide through long-term partnerships with landfills and local authorities. Numerous projects to produce renewable natural gas from waste are under development in Europe and North America, with the shared goal of making renewable gas accessible to as many people as possible.

 

Visit a WAGABOX® unit

Quebec's first WAGABOX® unit

WAGABOX® unit of Saint-Étienne-des-Grès (Enercycle)
Commissioning
May 2023
Installed capacity
468,000 GJ/year
Site operator
Enercycle logo
Utility
Logo Energir
Gas offtaker
Logo Energir
All of our projects
Operational
WAGABOX® unit of Pavie (Trigone)
Commissioning
May 2018
Installed capacity
54,000 GJ/year
Site operator
Logo Trigone
Utility
Logo GRDF
Type of site
40,000 tonnes
Waste stored/year
1.8 miles
Distance to pipeline
Landfill gas composition

45%

CH4

0-3%

O2

500 ppmv

H2S

5-25%

N2

Operational
WAGABOX® unit of Saint-Maximin (Suez)
Commissioning
June 2017
Installed capacity
90,000 GJ/year
Site operator
Logo Suez
Utility
Logo GRDF
Gas offtaker
Logo Suez
Type of site
200,000 tonnes
Waste stored/year
0.7 miles
Distance to pipeline
Landfill gas composition

45-50%

CH4

0-3%

O2

7000 ppmv

H2S

5-20%

N2

Operational
WAGABOX® unit of Saint-Florentin (Coved)
Commissioning
February 2017
Installed capacity
90,000 GJ/year
Site operator
Logo Paprec
Utility
Logo GRDF
Type of site
70,000 tonnes
Waste stored/year
1.8 miles
Distance to pipeline
Landfill gas composition

40-50%

CH4

0-3%

O2

1500

H2S

5-25%

N2

Operational
WAGABOX® unit of Clermont-Ferrand (Valtom)
Commissioning
2024
Installed capacity
450,000 GJ/year
Site operator
Logo Valtom
Under construction
WAGABOX® unit in Lanchester (CCSWA)
Commissioning
2025
Installed capacity
474,775 GJ/year
Site operator
Logo Pennsylvania States
Operational
WAGABOX® unit of Hartland (CRD)
Commissioning
2024
Installed capacity
360,000 GJ/year
Site operator
CRD logo
Utility
Operational
WAGABOX® unit in Davenport (W.C. Scott County)
Commissioning
2025
Installed capacity
216,000 GJ/year
Site operator
Waste Commission of Scott County Logo
Under construction
WAGABOX® unit of Madison (Rockingham County)
Commissioning
2026
Installed capacity
207,000 mmBtu/year
Site operator
Logo Rockingham
Under construction
WAGABOX® unit of Hébertville-Station (RMR)
Commissioning
2026
Installed capacity
198 000 Gj/year
Site operator
Under construction
WAGABOX® unit of Piantravigne (CSAI)
Commissioning
2026
Installed capacity
104 400,00 Gj/year
Site operator
Under construction
WAGABOX® unit of Beaumont (OCI Global)
Commissioning
2025
Installed capacity
360,000 GJ/year
Site operator
Under construction
WAGABOX® unit of Saint-Laurent-des-Hommes (SMD3)
Commissioning
2027
Installed capacity
60 120,00 Gj/year
Site operator
Under construction
WAGABOX® unit of Medina-Sidonia (Bioreciclaje/Enagás)
Commissioning
2027
Installed capacity
288,485 GJ/year
Site operator
Utility
Under construction
WAGABOX® unit in Monflanquin (Valorizon/Avergies)
Commissioning
2027
Installed capacity
43,257 GJ
Site operator