Our projects

Discover our projects
around the world

WAGABOX® units operate globally via long-term partnerships with landfills and authorities, with multiple projects aiming to make biomethane widely accessible

95%

WAGABOX® facility availability

58

WAGABOX® units worldwide

20 under construction and 38 operational

504k

tons of

of CO₂ equivalent emissions avoided since 2015

2,338

GWh of

biomethane injected since 2015

All of our projects

under-construction

Polo Industriale Scapigliato (Scapigliato)

Under construction

Italy

WAGABOX® Model

2400 m3/h

Commissioning

December 2026

Installed capacity

92 GWh/year

Distance to pipeline

2,3 km

Landfill gas composition

CH4

-

N2

-

under-construction

Rockingham (Rockingham County)

Under construction

United States

WAGABOX® Model

1600 m3/h

Commissioning

2026

Installed capacity

60 GWh/year

Distance to pipeline

3,22 km

Landfill gas composition

CH4

-

N2

-

Saint-Etienne-des-Grès (Enercycle)

Operational

Canada

WAGABOX® Model

3400 m3/h

Commissioning

May 2023

Installed capacity

130 GWh/year

Distance to pipeline

N/A

Landfill gas composition

CH4

46,60%

N2

19,80%

Saint-Florentin (Coved – Paprec)

Operational

France

WAGABOX® Model

400 m3/h

Commissioning

February 2017

Installed capacity

25 GWh/year

Distance to pipeline

3 km

Landfill gas composition

CH4

45,50%

N2

20,00%

saint-gaudens

Saint-Gaudens (Sivom SGMAM)

Operational

France

WAGABOX® Model

400 m3/h

Commissioning

January 2020

Installed capacity

35 GWh/year

Distance to pipeline

7,2 km

Landfill gas composition

CH4

41,80%

N2

27,10%

Discover our WAGABOX®