The main requirements are: a sufficient landfill gas flow rate (from 250 scfm), an operational gas collection system with good coverage of the site, and an accessible injection point on the natural gas grid (road transportation may also be considered in certain cases). Waga Energy conducts a feasibility study to assess the potential of your site and identify any preparatory work that may be required.