Fifteen WAGABOX® units in operation
Waga Energy operates fifteen WAGABOX® units and has contracts with major waste management companies, as well as with local authorities. Fifteen more units are under construction, in the USA, Canada, France and Spain.
Saint-Florentin
Capacity: 85,300 mmBtu/year
Landfill operator: Coved Environnement
Commissioning: February 14, 2017
Distance of the gas grid: 1.8 miles
Saint-Maximin
Capacity: 85,300 mmBtu/year
Landfill operator: Suez
Commissioning: June 26, 2017
Distance of the gas grid: 0.7 miles
Pavie
Capacity: 51,180 mmBtu/year
Landfill operator: Trigone
Commissioning: May 30, 2018
Distance of the gas grid: 1.8 miles
Saint-Palais
Capacity: 68,200 mmBtu/year
Landfill operator: Veolia
Commissioning: November 6, 2018
Distance of the gas grid: 0.6 miles
Gueltas
Capacity: 85,300 mmBtu/year
Landfill operator: Suez
Commissioning: November 13, 2018
Distance of the gas grid: 3.7 miles
Chevilly
Capacity: 51,180 mmBtu/year
Landfill operator: Suez
Commissioning: December 20, 2018
Distance of the gas grid: 3.7 miles
Izinzac-Lochrist
Capacity: 51,180 mmBtu/year
Landfill operator: Lorient Agglomération
Commissioning: November 26, 2019
Distance of the gas grid: 3.7 miles
Les-Ventes-de-Bourse
Capacity: 85,300 mmBtu/year
Landfill operator: Suez
Commissioning: January 15, 2020
Distance of the gas grid: 8.6 miles
Liéoux
Capacity: 119,400 mmBtu/year
Landfill operator: Sivom SGMAM
Commissioning: January 16, 2020
Distance of the gas grid: 4.3 miles
Le Ham
Capacity: 68,200 mmBtu/year
Landfill operator: Veolia
Commissioning: April 11, 2022
Distance of the gas grid: 6.7 miles
Blaringhem
Capacity: 85,300 mmBtu/year
Landfill operator: Baudelet Environnement
Commissioning: September 2, 2020
Distance of the gas grid: 0.7 miles
Gournay
Capacity: 51,180 mmBtu/year
Landfill operator: SEG
Commissioning: January 26, 2022
Distance of the gas grid: 13 miles
Claye-Souilly
Capacity: 409,000 mmBtu/year
Landfill operator: Veolia
Commissioning: March 9, 2022
Distance of the gas grid: 21.8 miles
Chatuzange-le-Goubet
Capacity: 61,410 mmBtu/year
Landfill operator: Veolia
Commissioning: 2024
Milhac-d'Auberoche
Capacity: 68,240 mmBtu/year
Landfill operator: Suez
Commissioning: Novemnber 11,2022
Distance of the gas grid: 18 miles
Montois-la-Montagne
Capacity: 51,180 mmBtu/year
Landfill operator: Suez
Commissioning: January 26, 2023
Distance of the gas grid: 2.7 miles
Cusset
Capacity: 51,180 mmBtu/year
Landfill operator: Suez / Vichy Communauté
Commissioning: 2023
Sainte-Marie-Kerque
Capacity: 71,650 mmBtu/year
Landfill operator: Séché Environnement
Commissioning: 2023
Granges
Capacity: 85,300 mmBtu/year
Landfill operator: Veolia
Commissioning: 2024
Can Mata
Capacity: 238,850 mmBtu/year
Landfill operator: PreZero
Commissioning: 2023
Saint-Etienne-des-Grès
Capacity: 444,000 mmBtu/year
Landfill operator: Régie de la Mauricie
Commissioning: 2023
Cowansville
Capacity: 102,000 mmBtu/year
Landfill operator: Régie de Brome-Missisquoi
Commissioning: 2023
Hartland
Capacity: 345,000 mmBtu/year
Landfill operator: CRD
Commissioning: 2024
Bath
Capacity: 205,000 mmBtu/year
Landfill operator: Steuben County
Commissioning: 2023
Mallard Ridge
Commissioning: March 28, 2022
Landfill operator: Air Liquide
Winnebago
Landfill operator: Air Liquide
Commissioning: Early 2023
WAGABOX® unit of Bath, NY
Landfill operator: Steuben County
Under construction
Capacity: 205,000 mmBtu/year

Delavan, WI
Landfill operator: Air Liquide
Commissioning: 28/02/2022

Winnebago, IL
Landfill operator: Air Liquide
Under construction

WAGABOX® unit of Saint-Étienne-des-Grès, Québec
Landfill operator: Enercycle
Under construction
Capacity: 444,000 mmBtu/year

WAGABOX® unit of Cowansville,
Québec
Landfill operator: RIGMRBM
Under construction
Capacity: 102,000 mmBtu/year

WAGABOX® unit of Hartland,
British Colombia
Landfill operator: CRD
Under construction
Capacity: 345,000 mmBtu/year

WAGABOX® unit of Saint-Florentin
Saint-Florentin landfill (France)
Commissioning: February 14, 2017
- 70,000 tons of waste per year
- Biogas: 40-50% CH4 | 0-3% O2 | 1,500 ppmv H2S | 5-25% N2
- Distance of the gas grid: 1,8 miles
- Existing gas recovery solution: leachate evaporation
- Capacity: 85,300 mmBtu

WAGABOX® unit of Saint-Maximin
Saint-Maximin landfill (France)
Commissioning: June 26, 2017
- 200,000 tons of waste per year
- Biogas: 45-50% CH4 | 0-3% O2 | 7,000 ppmv H2S | 5-20% N2
- Distance of the gas grid: 0.7 miles
- Existing gas recovery solution: leachate evaporation
- Capacity: 85,300 mmBtu

WAGABOX® unit of Pavie
Pavie landfill (France)
Commissioning: May 30, 2018
- 40,000 tons of waste per year
- Biogas: 40-50% CH4 | 0-3% O2 | 500 ppmv H2S | 5-25% N2
- Distance of the gas grid: 1.8 miles
- Existing gas recovery solution: leachate evaporation
- Capacity: 51,180 mmBtu

WAGABOX® unit of Saint-Palais
Saint-Palais lanfill (France)
Commissioning: November 6, 2018
- 90,000 tons of waste per year
- Biogas :40-50% CH4 | 0-3% O2 | 1,000 ppmv H2S | 5-20% N2
- Distance of the gas grid: 0.6 miles
- Existing gas recovery solution: Combine Heat and Power
- Capacity: 68,200 mmBtu

WAGABOX® unit of Gueltas
Gueltas landfill (France)
Commissioning: November 13, 2018
- 200,000 tons of waste per year
- Biogas :45-50% CH4 | 0-5% O2 | 1,000 ppmv H2S | 5-20% N2
- Distance of the gas grid: 3.7 miles
- Existing gas recovery solution: Combine Heat and Power
- Capacity: 85,300 mmBtu

WAGABOX® unit of Chevilly
Chevilly landfill (France)
Commissioning: December 20, 2018
- 60,000 tons of waste per year
- Biogas :40-50% CH4 | 0-3% O2 | 4,000 ppmv H2S | 5-20% N2
- Distance of the gas grid: 3.7 miles
- Existing gas recovery solution: leachate evaporation
- Capacity: 51,180 mmBtu

WAGABOX® unit of Izinzac-Lochrist
Izinzac-Lochrist landfill (France)
Commissioning: November 26, 2019
- 60,000 tons of waste per year
- Biogas: 45-50% CH4 | 0-3% O2 | 4,000 ppmv H2S | 5-20% N2
- Distance of the gas grid: 3.7 miles
- Existing gas recovery solution: leachate evaporation
- Capacity: 51,180 mmBtu

WAGABOX® unit of Les Ventes-de-Bourse
Les Ventes-de-Bourse landfill (France)
Commissioning: January 15, 2020
- 120,000 tons of waste per year
- Biogas: 45-50% CH4 | 0-3% O2 | 4,000 ppmv H2S | 5-20% N2
- Distance of the gas grid: 8.6 miles
- Existing gas recovery solution: leachate evaporation
- Capacity: 85,300 mmBtu

WAGABOX® unit of Liéoux
Liéoux landfill (France)
Commissioning: January 16, 2020
- 85,000 tons of waste per year
- Biogas: 45-50% CH4 | 0-3% O2 | 4,000 ppmv H2S | 5-20% N2
- Distance of the gas grid: 4.3 miles
- Existing gas recovery solution: leachate evaporation
- Capacity: 119,400 mmBtu

WAGABOX® unit of Blaringhem
Blaringhem landfill (France)
Commissioning: September 2, 2020
- 600,000 tons of waste per year
- Biogas: 40-50% CH4 | 0-3% O2 | 300 ppmv H2S | 5-20% N2
- Distance of the gas grid: 0.4 miles
- Existing gas recovery solution: four engines
- Capacity: 85,300 mmBtu

WAGABOX® unit of Gournay
Gournay landfill (France)
Commissioning: January 26, 2022
- 85,000 tons of waste per year
- Biogas: 45-50% CH4 | 0-3% O2 | 600 ppmv H2S | 15-20% N2
- Distance of the gas grid: 8 miles
- Existing gas recovery solution: leachate evaporation
- Capacity: 51,180 mmBtu

WAGABOX® unit of Claye-Souilly
Claye-Souilly landfill (France)
Commissioning: March 9, 2022
- 1,100,000 tons of waste per year
- Biogas: 40-50% CH4 | 0.1-3% O2 | 0-50 ppmv H2S | 1-20% N2
- Distance of the gas grid: 13.5 miles
- Existing gas recovery solution: Combine Heat and Power
- Capacity: 409,000 mmBtu

WAGABOX® unit of Milhac-d’Auberoche
Milhac-d’Auberoche landfill (France)
Commissioning: November 11, 2022
- 105,000 tons of waste per year
- Biogas: 40-50% CH4 | 0-3% O2 | 0-50 ppmv H2S | 1-20% N2
- Distance of the gas grid: 11 miles
- Capacity: 85,300 mmBtu

WAGABOX® unit of Montois-la-Montagne
Montois-la-Montagne landfill (France)
Commissioning: January 26, 2023
- 100,000 tons of waste per year
- Distance of the gas grid: 2.7miles
- Capacity: 51,180 mmBtu